Overhead Lines Training PhotoBlog by Murray Jones
Published 16 Apr 2020
Overhead Lines Training
All Images : Murray Jones –Â Transmission Live Line Work Officer at Ergon-Energex
Murray is a specialist trainer responsible for transmission live work audits, re-authorisations and live work method development for live line stick and bare hand crews.
Duties include running training for the transmission and distribution field crews in the areas of High Risk plant up to and including advanced rigging techniques for the electrical transmission industry, with conductor stringing and winching applications for all field crews, along with all applicable rescue procedures and techniques from single person rescue.
275kV V String Insulator Change
Tension Insulator Removal Via 5-1 Tackle Rigged With Samson Rope & Horizontal Ladder
Tension Insulator Change From Horizontal Ladder With 3t Lever Hoist
Changing Bolted Connections From The Horizontal Ladder With D3T90 Structure
Remove Conductors & Change Tower Crossarm. Conductor Left Suspended From Insulators Below Block & Tackle
Concrete Pole Flying Angle Insulator Change. Hook Ladder & Lever Hoist
Lower 275kV Conductor Via Square Rig & 3/1 Tackle Using Samson Rope As A Winch Extension
Changing Bridging Restraint Strings
Horizontal Ladder Training – 6m Side Reach At 40m
Changing Conductor Spacer With Aeropower Helicopters
400kV Live Line Insulator Wash. This is an operational rather than a training shot, but its one of the tasks carried out during Aeropowers live line re-certification training. Insulator washing is performed to remove salt and other pollution deposits from insulator strings which allows them to operate at a greater efficiency. This can be carried out with the line still energised by using “clean” water. Essentially, pure water is not a conductor of electricity.
Further Reading
Jointers blog
Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.
Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.