Overhead Lines Training PhotoBlog by Murray Jones

Published 16 Apr 2020

Overhead Lines Training

All Images : Murray Jones – Transmission Live Line Work Officer at Ergon-Energex

Overhead Lines Training

Murray is a specialist trainer responsible for transmission live work audits, re-authorisations and live work method development for live line stick and bare hand crews.

Duties include running training for the transmission and distribution field crews in the areas of High Risk plant up to and including advanced rigging techniques for the electrical transmission industry, with conductor stringing and winching applications for all field crews, along with all applicable rescue procedures and techniques from single person rescue.

275kV V String Insulator Change

275kV V String Insulator Change

Tension Insulator Removal Via 5-1 Tackle Rigged With Samson Rope & Horizontal Ladder

Tension Insulator Removal Via 5-1 Tackle Rigged With Samson Rope & Horizontal Ladder

Tension Insulator Change From Horizontal Ladder With 3t Lever Hoist

Tension Insulator Change From Horizontal Ladder With 3t Lever Hoist

Changing Bolted Connections From The Horizontal Ladder With D3T90 Structure

Changing Bolted Connections From The Horizontal Ladder With D3T90 StructureRemove Conductors & Change Tower Crossarm. Conductor Left Suspended From Insulators Below Block & Tackle

Remove Conductors & Change Tower Crossarm. Conductor Left Suspended From Insulators Below Block & Tackle

Concrete Pole Flying Angle Insulator Change. Hook Ladder & Lever Hoist

Concrete Pole Flying Angle Insulator Change. Hook Ladder & Lever Hoist

Lower 275kV Conductor Via Square Rig & 3/1 Tackle Using Samson Rope As A Winch Extension

Lower 275kV Conductor Via Square Rig & 3/1 Tackle Using Samson Rope As A Winch Extension.

Changing Bridging Restraint Strings

Changing Bridging Restraint Strings

Horizontal Ladder Training – 6m Side Reach At 40m

Horizontal Ladder Training - 6m Side Reach At 40m

Changing Conductor Spacer With Aeropower Helicopters

Changing Conductor Spacer With Aeropower Helicopters

400kV Live Line Insulator Wash. This is an operational rather than a training shot, but its one of the tasks carried out during Aeropowers live line re-certification training. Insulator washing is performed to remove salt and other pollution deposits from insulator strings which allows them to operate at a greater efficiency. This can be carried out with the line still energised by using “clean” water. Essentially, pure water is not a conductor of electricity.

400kV Live Line Insulator Wash.

Further Reading

Jointers blog

Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

15,000+ Subscribers. âž¡ Joints Terminations Cleats Lugs MV HV 11kV 33kV