Supplying Cable Termination, Jointing, Pull-in & Electrical Equipment up to 66kV

Published 13 Jan 2022

Thorne & Derrick | Termination, Jointing, Pull-in & Electrical Equipment up to 66kV

Thorne & Derrick International are Specialist Suppliers to the UK and international Offshore Wind Industry of products to provide safe and reliable LV HV Electrical Cable Termination, Jointing, Installation & Power Systems up to 66kV.

We are based in North-East England, recognised as a key strategic location to service the offshore renewables energy market in the UK, from the North Sea to the Nordics – our Exports Division support international offshore wind power projects from USA to China.

Key Product Categories: Connectors, Joints & Terminations MV HV | Cable Preparation & Jointing Tools | Duct Seals | Cable Transits | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Clothing & ProtectionCable Pulling | Earthing & Lightning Protection | Feeder Pillars

Main UK Stockists for:  3M Electrical, PFISTERER Connex, Nexans Power Cable Accessories (Euromold), Alroc, Ellis Patents, ABB, Roxtec, Cembre & CATU Electrical.


Recent Projects

1 Block Island Offshore Wind Farm USA | GE Renewable Energy | Thorne & Derrick, as Approved Vendors to GE Renewable Energy, supplied Earthing, Static Discharging & Electrical Safety Equipment to the substations plus a 33kV Cable Accessories package to power, joint and connect the medium voltage switchgear and transformers.

2 Operational Offshore Wind Farms (12 Locations) | Orsted | Thorne & Derrick, as Approved Vendors to Orsted, supplied both standard and customised heat shrink joints manufactured by Nexans to enable planned maintenance and repair of the ABB, NKT, TFK & Prysmian High Voltage Cables – included land and subsea cable systems operating at 33kV.

3 Multiple Offshore Wind Farm Assets | JDR Cable Systems | Thorne & Derrick, as Approved Vendors to JDR Cable Systems, developed MV Jointers Tool Kits to provide offshore wind technicians with the specialist tools needed to prepare inter array cables up to 33kV prior to the installation of joints, terminations or connectors to the highest standard – included tools to enable the removal of the cable outersheath, insulation (XLPE) and semicon screens.

Jointer Tool Kits

The Jointers Tool Kits are designed to provide their jointers with the specialist cable tools needed to prepare inter array cables up to 33kV prior to the installation of joints, terminations or connectors to the highest standard.

4 Bespoke & Standard Cable Clamps, Saddles & Cleats | Developed client customised cable support and cleat systems for high voltage cables in the nacelle/tower of WTG’s for a world leading manufacturer of wind turbines currently under NDA.

We are also approved vendors to SSE Renewables, Swire Energy Services (ALL NRG), Vestas Wind Systems A/S, Correll Group, Van Oord, Vattenfall, Boskalis and other leading renewable energy companies throughout the world.

5 Cable Pull-in Equipment | Working with Balfour Beatty plc on the Viking Link project Thorne & Derrick supplied a range of cable drum handling, socks, rollers and lubrication products to enable the safe pulling and trenching of high voltage power cables.

Image Courtesy | Max States Site Engineer at Balfour Beatty plc (Viking Link) – here the EHV 526kV cable is pictured being pulled from a 62 tonne cable drum (1240m circuit) into the cable trench via rollers in July 2021. Viking Link is a 1,400 MW HVDC submarine power cable under construction between the United Kingdom and Denmark.

Image Courtesy | Max States Site Engineer at Balfour Beatty plc (Viking Link) – here the EHV 526kV cable is pictured being pulled from a 62 tonne cable drum (1240m circuit) into the cable trench via rollers in July 2021. Viking Link is a 1,400 MW HVDC submarine power cable under construction between the United Kingdom and Denmark.

NOF Offshore Wind Industry


Thorne & Derrick

Specialist Distributors to the UK and international Offshore Wind & Renewable industry to provide safe and reliable LV HV Electrical Cable & Power Distribution Systems up to 66kV – we are highly customer responsive and absolutely committed to providing a world-class service. Contact our UK Power Team for competitive quotations, fast delivery from stock and technical support or training on all LV-HV products.

thorne and derrick wind industry

See how T&D support, supply and service the Renewable Energy industry.

 

MV HV Cables 11kV 33kV

Stockists & Suppliers | UK & International Projects

Further Reading