Thorne & Derrick at Solar & Storage Live 2026
Published 11 Aug 2026

Thorne & Derrick will be attending Solar & Storage Live UK 2026 at the NEC Birmingham from 22nd–24th September, showcasing our support for HV cable accessories, joints, terminations, separable connectors, cable tooling and grid connection products used across solar, battery storage and renewable energy infrastructure projects.
Visitors can find Thorne & Derrick on Stand E73, where our team will be available to discuss products and technical support for Solar EPCs, high voltage jointing contractors, installers, utilities, contractors and developers working on UK and international projects.
Solar and battery energy storage projects rely on dependable electrical infrastructure to connect, protect and energise cable systems safely. From solar farm cabling and substation connections through to transformer, switchgear and grid connection works, Thorne & Derrick support the supply of specialist products used throughout the installation process.
Visit Thorne & Derrick on Stand E73
At Solar & Storage Live UK 2026, the Thorne & Derrick stand will focus on products used in the construction, connection, maintenance and operation of solar and battery storage infrastructure.
Visit us on Stand E73 to speak with our team about:
HV Cable Joints & Terminations
Cable joints, terminations and separable connectors for 11kV, 33kV and 66kV applications.
Cable Preparation Tooling
Cable preparation, crimping, cutting and stripping tools for jointing and termination works.
Cable Protection Systems
Cable ducting, troughing, sealing and protection products for site infrastructure and cable routes.
Cleats, Clamps & Fixings
Cable cleats, clamps and fastening systems for safe and secure cable installation.
Lugs, Glands & Connectors
Cable lugs, glands and connectors for electrical connection and installation works.
Substation Safety Equipment
Electrical safety equipment for workers operating around HV systems and grid connection infrastructure.

Live Tooling Demonstrations on the Stand
Live tooling demonstrations will be taking place on Stand E73, showcasing cable installation, preparation and jointing tools used by cable jointers, installers and contractors working on high voltage cable systems.
The demonstrations will provide visitors with the opportunity to see selected cable preparation, crimping, cutting and stripping tools in action, while discussing suitable tooling for solar farm, battery storage, substation and grid connection projects.
This hands-on element of the stand is designed to support practical conversations around cable preparation, installation efficiency, tooling selection and safe working practices on site.
Supporting Solar EPCs & High Voltage Jointing Contractors
Thorne & Derrick are specialist distributors to Solar EPCs and high voltage jointing contractors, supporting the design, construction and maintenance of UK and international energy infrastructure projects.
Our product range supports the connection of 600V and 1500V solar cables into combiner boxes, inverters and transformers, as well as the energisation of switchgear for high voltage grid connections.
As solar farms and battery energy storage systems continue to grow in scale, the need for reliable cable accessories, tooling, connectors and substation equipment remains critical to safe and efficient project delivery.
Products for Solar, BESS & Grid Connection Projects
Thorne & Derrick supply a wide range of LV, MV and HV electrical products used across renewable energy infrastructure, including:
- HV cable joints and terminations
- Separable connectors and bushings
- Cold shrink and heat shrink cable accessories
- Cable preparation and jointing tools
- Crimping and cutting tools
- Shearbolt connectors and bi-metallic lugs
- Cable glands, cleats, clamps and fixings
- Cable ducting, troughing and protection systems
- Substation safety and electrical equipment
Our technical knowledge, responsive customer support and extensive supply capability allow us to support contractors and project teams with products required for installation, connection, maintenance and energisation works.
Featured Product Areas
Cable Joints & Terminations
HV cable accessories for solar farms, substations, BESS projects, transformers and grid connection applications.
Separable Connectors
MV and HV connector solutions for switchgear, transformers and electrical equipment used in renewable energy infrastructure.
Cable Tooling
Preparation, stripping, cutting, crimping and jointing tools used by installers and high voltage cable jointers.
Cable Protection
Cable cleats, clamps, troughing, duct sealing and protection systems for safe and reliable cable installation.
Meet the Team at Solar & Storage Live UK 2026
The Thorne & Derrick team will be available across the three days of the event to discuss upcoming project requirements, product selection, technical applications and supply support.
If you are involved in solar, battery storage, substation, grid connection or wider renewable energy infrastructure projects, visit Stand E73 to speak with us about how we can support your next project.
Event Details
Solar & Storage Live UK 2026
NEC Birmingham
22nd–24th September 2026
E73
Opening Hours
- Tuesday 22nd September: 09:30–17:30
- Wednesday 23rd September: 09:30–17:30
- Thursday 24th September: 09:30–16:00
Visit Thorne & Derrick on Stand E73
Since 1985, Thorne & Derrick have provided specialist technical support and express delivery from extensive UK stocks to worldwide destinations.
At Solar & Storage Live UK 2026, we will be showcasing our support for the solar and battery storage industry with a focus on HV cable accessories, cable jointing, terminations, tooling and grid connection products.
Visit Thorne & Derrick on Stand E73 at the NEC Birmingham from 22nd–24th September 2026.