Offshore Wind Power Cable Management | Top 5 Challenges

Published 31 Aug 2022

Top 5 challenges in wind power cable management

Top 5 Challenges In Wind Power Cable Management

Offshore Wind Power Cable Management

Roxtec Top 5 Challenges

Thorne & Derrick are Approved Distributors for Roxtec, the leading manufacturer of sealing solutions for cables and pipes, to protect electricity Transmission & Distribution assets including windfarm substations against water ingress, gas migration and fire hazards.


Below Roxtec have compiled the top 5 most common issues we all struggle with on offshore substations.

1. Specifications & Certificates

We all want to ensure safety and operational reliability, and use high quality products to deliver the best result we can. Therefore, we often meet specifications and requirements demanding a multitude of certificates. However, it is not guaranteed that all types of cable sealing methods are approved.

The best thing would be to find a sealing solution that has passed all tests and certifications.

2. Uncertain Estimates

It can be difficult to know how many cables or pipes, or what size power and instrumentation cables, we need to route. We can never be sure about making the right openings, or about how to seal all those penetrations. Even the best of estimates cannot predict all late design changes.

What we need is a sealing system that is as adaptable as possible to the number and size of cables, pipes or openings. It should be so flexible that we would be able to have spare capacity.

Cable Management

3. Hard Cables To Handle

It is difficult, or almost impossible, to move and bend a large high-voltage or medium-voltage power cable into the desired position for routing through a deck or bulkhead. It takes a lot of time to reorganize the routing path in order to gain a couple of millimeters of bending radius.

What you need is a solution where you can position and apply a seal to fit around the cables, even if they are in an off-center position.

4. Tricky Design Work

Given the issues mentioned above, the work of design engineers often becomes a nightmare. We need to plan, calculate and design in cable and pipe penetrations at an early stage considering both rollout and maintenance. Sometimes, it means recalculating each opening.

Imagine a web-based design tool that we can use to design and redesign transits in no time.

Time consuming cable installation

5. Time-Consuming Installation

We know renewables can save the climate, and we know speed is crucial and time is money. Therefore, it is so frustrating to struggle with sealing solutions that are neither flexible nor easy to install. We cannot accept that project plans fail due to complicated installation work tasks. We should only engage suppliers of user-friendly products who will also train the installation team.


Roxtec provides offshore wind farms with an “all in one” solution for cable entry sealing, cable management and vibration damping. Standardise with Roxtec seals for efficient offshore windfarm cable protection design, quick roll-out and certified protection – cables are securely fixed, sealed and cable lifetime is extended.

Roxtec


Thorne & Derrick are Specialist Distributors to the UK and international Offshore Wind & Renewable industry to provide safe and reliable

LV HV Electrical Cable & Power Distribution Systems up to 66kV – we are highly customer responsive and absolutely committed to providing a world-class service.

Contact our UK Power Team for competitive quotations, fast delivery from stock and technical support or training on all LV-HV products.

Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV HV 

See how T&D support, supply and service the Renewable Energy industry.

See how T&D support, supply and service the Renewable Energy industry.

THORNE & DERRICK LV HV Jointing, Earthing, Substation & Electrical Eqpt