Blog

Thorne & Derrick’s POWER Blog is regularly updated with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

➡ View T&D’s brochure – contact our Sales Team with your requirements.

We focus on Product CategoriesDuct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder PillarsCable Joints LV | Joints & Terminations MV HV 

We provide guidance and technical support for the installation of LV, MV & HV Cable Joints, Terminations, Substation & Electrical Equipment from our Key Suppliers including:

3M CMP Ellis Patents
Nexans Euromold Elastimold Pfisterer
Prysmian Alroc CSD
Roxtec CATU Electrical Cembre
Lucy Zodion ABB Emtelle

MV HV Cables 11kV 33kV

With Photo Blog contributions from our social network of utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

JOINT ♦ TERMINATE ♦ CONNECT ♦ GLAND ♦ CLEAT ♦ CRIMP ♦ DUCT ♦ SEAL ♦ REPAIR ♦ CABLE ♦ SPLICE ♦ INSULATE


You are currently filtering by: Offshore Wind Farm Cables

66kV 72.5kV | Power Cables Accessories for Offshore Windfarms

Published 08 Dec 2022

66kV 72.5kV | Power Cables Accessories for Offshore Windfarms

Power Cable Accessories Nexans Power Accessories is the leading European innovator and manufacturer of Low, Medium & High Voltage Cable Accessories as well as connection technology for energy transmission and distribution networks, including both onshore and offshore renewable projects. The Nexans range of Medium Voltage Power Cable Accessories ranged...

Read More 

Onshore Cable Pulling Starts At Seagreen Offshore Wind Farm

Published 06 Sep 2021

Onshore Cable Pulling Starts At Seagreen Offshore Wind Farm

Cable Pulling & Laying Work is underway to pull cabling through 19.5 kilometres of underground ducts which will connect the GBP 3 billion Seagreen Wind Farm to the Scottish National Grid. The cable pulling is the latest stage in the cable installation process and another milestone in the construction...

Read More 

Superconducting Cable Systems – The Future?

Published 30 Jun 2021

Superconducting Cable Systems – The Future?

Reproduced with kind permission of Mane - Worldwide Recruitment Specialists. Cable Systems Superconducting cables could be the answer to distribution challenges in offshore wind. Achieving submarine power transmission with low loss and high capacity is vital for the future of renewable energy. But recent breakthroughs have relied on high-voltage...

Read More 

Why Large Offshore Wind Farms Should Double Their Intra-Array Voltage

Published 11 May 2021

Why Large Offshore Wind Farms Should Double Their Intra-Array Voltage

Reproduced with kind permission of Mane - Worldwide Recruitment Specialists. Offshore Wind Farms Offshore wind farms are now the biggest contributor of green energy to the National Grid. But the cost of installing and running them is problematically high – and the race is on to solve that problem...

Read More 

X
Logos
Tiled images
Associated manufacturers
X

Get a quote

Complete the form below to make an enquiry about products.

  • Please enter your full name.
  • Please enter your contact telephone number.
  • Please enter your e-mail address.
  • Please select if you are enquiring about products for the UK or for export.
  • This field is for validation purposes and should be left unchanged.