Blog

Thorne & Derrick’s POWER Blog is regularly updated with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

➡ View T&D’s brochure – contact our Sales Team with your requirements.

We focus on Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV HV 

We provide guidance and technical support for the installation of LV, MV & HV Cable Joints, Terminations, Substation & Electrical Equipment from our Key Suppliers including:

3M CMP Ellis Patents
Nexans Euromold Elastimold Pfisterer
Prysmian Alroc CSD
Roxtec CATU Electrical Cembre
Lucy Zodion ABB Emtelle

MV HV Cables 11kV 33kV

With Photo Blog contributions from our social network of utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

JOINT ♦ TERMINATE ♦ CONNECT ♦ GLAND ♦ CLEAT ♦ CRIMP ♦ DUCT ♦ SEAL ♦ REPAIR ♦ CABLE ♦ SPLICE ♦ INSULATE


Cable Bending Radius Explained: Minimum Radius & Installation Risks

Published 15 Oct 2026

Cable Bending Radius Explained: Minimum Radius & Installation Risks

Cable bending radius is the minimum radius to which an electrical cable can be bent without risking damage to its construction or compromising its intended performance. It is an important consideration when installing LV, MV and HV power cables through underground ducts, trenches, substations, cable trays and other electrical...

Read More 

Why Do Underground Cable Joints Fail?

Published 15 Oct 2026

Why Do Underground Cable Joints Fail?

Underground cable joints fail when their electrical insulation, conductor connections or protective sealing systems can no longer perform their intended function. Common causes include moisture ingress, incorrect cable preparation, insulation damage, poor conductor connections, excessive electrical stress and unsuitable installation conditions. Although underground power cables are designed for long-term...

Read More 

Charlie & Ella Complete Sales Apprenticeships

Published 02 Sep 2026

Charlie & Ella Complete Sales Apprenticeships

Celebrating Charlie & Ella’s Level 4 Sales Executive Apprenticeships At Thorne & Derrick International, we are proud to champion talent development and recognise the dedication required to achieve professional growth. We are therefore delighted to congratulate Charlie Baines and Ella Bradley, who have both successfully completed their Level 4...

Read More 

Thorne & Derrick at Solar & Storage Live 2026

Published 11 Aug 2026

Thorne & Derrick at Solar & Storage Live 2026

Thorne & Derrick will be Exhibiting at Solar & Storage Live UK 2026 at the NEC Birmingham from 22nd–24th September, showcasing our support for HV Cable Accessories, Joints, Terminations, Separable Connectors, Cable Tooling and Grid Connection Products used across solar, battery storage and renewable energy infrastructure projects. Visitors can...

Read More 

Get Ready For Faraday Power Group 3

Published 10 Aug 2026

Get Ready For Faraday Power Group 3

On Friday 4th of September, Thorne & Derrick will be welcoming you to Faraday Power Group Event #FPG3.   We look forward to seeing clients, suppliers, service providers and professionals from the High Voltage Power Industry. What is FPG? Faraday Power Group is an informal, friendly, open-network of professional...

Read More 

X
Logos
Tiled images
Associated manufacturers
X

Get a quote

Complete the form below to make an enquiry about products.

  • This field is for validation purposes and should be left unchanged.
  • Please enter your full name.
  • Please enter your contact telephone number.
  • Please enter your e-mail address.
  • Please select if you are enquiring about products for the UK or for export.