Blog
Thorne & Derrick’s POWER Blog is regularly updated with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.
➡ View T&D’s brochure – contact our Sales Team with your requirements.
We focus on Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV HV
We provide guidance and technical support for the installation of LV, MV & HV Cable Joints, Terminations, Substation & Electrical Equipment from our Key Suppliers including:
3M |
CMP |
Ellis Patents |
Nexans Euromold |
Elastimold |
Pfisterer |
Prysmian |
Alroc |
CSD |
Roxtec |
CATU Electrical |
Cembre |
Lucy Zodion |
ABB |
Emtelle |

With Photo Blog contributions from our social network of utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.
JOINT ♦ TERMINATE ♦ CONNECT ♦ GLAND ♦ CLEAT ♦ CRIMP ♦ DUCT ♦ SEAL ♦ REPAIR ♦ CABLE ♦ SPLICE ♦ INSULATE
You are currently filtering by: Blog
Published 26 Mar 2021
Resource Centre | Education & Learning with Nexans Thorne & Derrick provide competitive prices and fast delivery from stock for the complete range of Nexans MV-HV Connectors, Joints & Terminations to connect, splice, repair and maintain medium/high voltage cable and power distribution systems. A complete range of Joints, Terminations...
Read More
Published 26 Mar 2021
Vestas turns to Nexans Windlink® Two-year contract will see around one million Windlink cable kits installed inside Vestas turbines across the globe A local extended supply chain to match Vestas global footprint while reducing carbon impact A successful partnership for the development of the EnVentus platform thanks to our...
Read More
Published 26 Mar 2021
High Voltage Cable Re-alignment Offshore Substations Special thanks to Geoff Briggs MIET from MGL Cable Services for the kind permission to republish this short case study in Wind Energy Network When substation high voltage cable routing design and installation specifications do not align, MGL Cable Services bring expertise and...
Read More
Published 26 Mar 2021
Image Courtesy of: John McGaughan, Safety Manager/U.G. Cable Systems Operation Specialist-NCCER/FACTE Certified Training Instructor at Barrow Power LLC. Pictured: Transformer Hi-Side PILC Cable Termination Chamber With Stress Cones TECO & PILC Cable “We only replace PILC cable that goes bad. We have about 95% in our Network system downtown....
Read More
Published 26 Mar 2021
Image Courtesy of: Daniel Betts (33KV 11KV LV Cable Jointer at Western Power Distribution). Pictured: 0.3 Square Inch PILC STA To 3 Core 300sqmm Wavecon Mains Transitional Straight Cable Joint Wavecon Cable Wavecon cable is the typical replacement for paper/lead cables in the LV distribution network. Wavecon cable is available as “CNE”...
Read More