Blog

Thorne & Derrick’s POWER Blog is regularly updated with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

➡ View T&D’s brochure – contact our Sales Team with your requirements.

We focus on Product CategoriesDuct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder PillarsCable Joints LV | Joints & Terminations MV HV 

We provide guidance and technical support for the installation of LV, MV & HV Cable Joints, Terminations, Substation & Electrical Equipment from our Key Suppliers including:

3M CMP Ellis Patents
Nexans Euromold Elastimold Pfisterer
Prysmian Alroc CSD
Roxtec CATU Electrical Cembre
Lucy Zodion ABB Emtelle

MV HV Cables 11kV 33kV

With Photo Blog contributions from our social network of utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

JOINT ♦ TERMINATE ♦ CONNECT ♦ GLAND ♦ CLEAT ♦ CRIMP ♦ DUCT ♦ SEAL ♦ REPAIR ♦ CABLE ♦ SPLICE ♦ INSULATE


Cable Duct Support System | New Wear Bridge Crossing

Published 16 Dec 2022

Cable Duct Support System | New Wear Bridge Crossing

Thorne & Derrick | Distributors for Ellis Patents | Cleats | Supports | Hooks New Wear Bridge Crossing Northern Power Grid installed power cables under the New Wear Bridge as a new main supply route. The existing route on the Queen Alexander Bridge was scheduled to be decommissioned due...

Read More 

Emperor & ProTect Cable Cleats | Taishan Nuclear Power Project

Published 16 Dec 2022

Emperor & ProTect Cable Cleats | Taishan Nuclear Power Project

Thorne & Derrick | Distributors for Ellis Patents | Cleats | Supports | Hooks Taishan Nuclear Power Project The Taishan Nuclear Power Project is a joint venture between EDF and China Guangdong Nuclear Power Group, it is the second nuclear power station to be built using Areva’s 1,750 megawatt...

Read More 

Emperor Cleats | Petrobras FPSO, Brazil

Published 16 Dec 2022

Emperor Cleats | Petrobras FPSO, Brazil

Thorne & Derrick | Distributors for Ellis Patents | Cleats | Supports | Hooks Petrobras FPSO, Brazil The FPSO is the first of eight replica FPSOs to be built for the development of the pre-salt projects in the prolific Santos basin. The vessel will have a processing capacity of 150,000 bpd...

Read More 

Pre-Commissioning LV HV Systems by Oakes Power Services Ltd

Published 16 Dec 2022

Pre-Commissioning LV HV Systems by Oakes Power Services Ltd

by Daniel Oakes | Managing Director | Oakes Power Services Lts uploaded by Chris Dodds | Sales & Marketing Manager at Thorne & Derrick  Pre-Commissioning, also known as “Pre-functional Testing,” is an essential step in the installation and implementation of Low & High Voltage Electrical Power Systems – this...

Read More 

Trefoil Cable Cleat | UKPN London Power Tunnel

Published 16 Dec 2022

Trefoil Cable Cleat | UKPN London Power Tunnel

Thorne & Derrick | Distributors for Ellis Patents | Cleats | Supports | Hooks | Cable Hangers UKPN London Power Tunnel The London Power Tunnels project will create a new 32km electricity super highway deep below the capital, which will help keep Londoners connected to safe and reliable electricity...

Read More 

X
Logos
Tiled images
Associated manufacturers
X

Get a quote

Complete the form below to make an enquiry about products.

  • This field is for validation purposes and should be left unchanged.
  • Please enter your full name.
  • Please enter your contact telephone number.
  • Please enter your e-mail address.
  • Please select if you are enquiring about products for the UK or for export.