UK: 0191 410 4292

Exports: +44 (0) 117 935 9421

Blog

Thorne & Derrick’s POWER Blog is regularly updated with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

➡ View T&D’s brochure – contact our Sales Team with your requirements.

We focus on Product CategoriesDuct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder PillarsCable Joints LV | Joints & Terminations MV HV 

We provide guidance and technical support for the installation of LV, MV & HV Cable Joints, Terminations, Substation & Electrical Equipment from our Key Suppliers including:

3M CMP Ellis Patents
Nexans Euromold Elastimold Pfisterer
Prysmian Alroc CSD
Roxtec CATU Electrical Cembre
Lucy Zodion ABB Emtelle

MV HV Cables 11kV 33kV

With Photo Blog contributions from our social network of utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

Joints Terminations Connectors - Nexans Euromold Pfisterer 3M

JOINT ♦ TERMINATE ♦ CONNECT ♦ GLAND ♦ CLEAT ♦ CRIMP ♦ DUCT ♦ SEAL ♦ REPAIR ♦ CABLE ♦ SPLICE ♦ INSULATE


Solar Farms Replace Nylon Cable Ties With Metal Cable Ties

Published 26 May 2020

Solar Farms Replace Nylon Cable Ties With Metal Cable Ties

BAND-IT Ball-Lok Metal Cable Ties Essential. Everywhere. Together.  The BAND-IT Ball-Lok range of stainless steel cable ties provide fast and reliable bundling of LV MV HV cables for maximum strength, reliability and clamping of cables. The corrosion resistant stainless cable steel ties with self-locking design are used to bundle, tie or...

Read More 

ATEX Electric Heaters | Safe Substation Heating for Battery Rooms

Published 23 Apr 2020

ATEX Electric Heaters | Safe Substation Heating for Battery Rooms

Electrical Heating uploaded by Chris Dodds | Sales & Marketing Manager with Thorne & Derrick International Electric heaters forming part of the Electric Heater Schedule for the development and construction of Onshore and Offshore Wind Farms are generally located within the battery room section of medium/high voltage substations and...

Read More 

NEW | Arc Flash Hoods From Protection Specialists ProGARM

Published 21 Apr 2020

NEW | Arc Flash Hoods From Protection Specialists ProGARM

ProGARM delivers ultimate Arc Flash clothing and protection, including Arc Flash Coveralls, and Arc flash Hoods conforming with the relevant industry and EN standards ensuring protection from Arc Flash incidents. THE SPECIALIST CHOICE FOR ARC FLASH PROTECTION ProGARM is the leading UK manufacturer of high-quality flame-resistant Arc Flash coveralls, garments...

Read More 

CASE STUDY: ULTIMA Connect At The London Olympics

Published 21 Apr 2020

CASE STUDY: ULTIMA Connect At The London Olympics

Cubis systems were involved in the major project of the London 2012 Olympics site and stadium redevelopment. The implementation of Cubis Access Chambers (in particular, the ULTIMA Connect) to assist with the redevelopment project resulted in huge savings in time and cost. The underground infrastructure was developed in time...

Read More 

Which Access Chamber Can Be Built Faster?

Published 21 Apr 2020

Which Access Chamber Can Be Built Faster?

The following Access Chamber test, performed by Cubis, has taken place in order to determine which Chamber Access method performs the best and can be installed the fastest – the time trial provides a comparison between conventional brick built and modern technology modular style access chambers. access Chamber Testing...

Read More 

X
Logos
Tiled images
Associated manufacturers
X

Get a quote

Complete the form below to make an enquiry about products.

  • Please enter your full name.
  • Please enter your contact telephone number.
  • Please enter your e-mail address.
  • Please select if you are enquiring about products for the UK or for export.
  • This field is for validation purposes and should be left unchanged.