Blog

Thorne & Derrick’s POWER Blog is regularly updated with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

➡ View T&D’s brochure – contact our Sales Team with your requirements.

We focus on Product CategoriesDuct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder PillarsCable Joints LV | Joints & Terminations MV HV 

We provide guidance and technical support for the installation of LV, MV & HV Cable Joints, Terminations, Substation & Electrical Equipment from our Key Suppliers including:

3M CMP Ellis Patents
Nexans Euromold Elastimold Pfisterer
Prysmian Alroc CSD
Roxtec CATU Electrical Cembre
Lucy Zodion ABB Emtelle

MV HV Cables 11kV 33kV

With Photo Blog contributions from our social network of utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

JOINT ♦ TERMINATE ♦ CONNECT ♦ GLAND ♦ CLEAT ♦ CRIMP ♦ DUCT ♦ SEAL ♦ REPAIR ♦ CABLE ♦ SPLICE ♦ INSULATE


You are currently filtering by: Cable Joints & Terminations HV

BS7609 | Crimping Cables With Cembre Cable Lugs & Tools

Published 09 Aug 2018

BS7609 | Crimping Cables With Cembre Cable Lugs & Tools

uploaded by Chris Dodds - Thorne & Derrick Sales & Marketing Manager BS7609 Code Of Practice For Installing Uninsulated Connectors With Copper Or Aluminium Conductors BS7609 The BS7609 code is a British Standard which sets out what is best practice for the installation and inspection of uninsulated compression and mechanical connectors...

Read More 

Medium & High Voltage Power Cable Systems – Diagnostic Services

Published 06 Jul 2018

Medium & High Voltage Power Cable Systems – Diagnostic Services

uploaded by Chris Dodds - Thorne & Derrick Sales & Marketing Manager IMCORP is the technology leader in Medium & High Voltage Power Cable Systems life cycle condition assessment and performance – IMCORP have been helping their clients achieve maximum cable reliability for more than 20 years and have...

Read More 

132kV Link Boxes & Bonding Leads For High Voltage HV Cable Systems

Published 20 Jun 2018

132kV Link Boxes & Bonding Leads For High Voltage HV Cable Systems

uploaded by Chris Dodds - Thorne & Derrick Sales & Marketing Manager HV Link Boxes & Bonding Leads What Are Link Boxes? Link boxes are installed on medium/high voltage power systems in conjunction with MV HV Cable Joints & Terminations incorporating a sheath break to prevent sheath circulating currents...

Read More 

Some Thoughts On MV HV Heat Shrink Cable Joints & Cable Terminations

Published 30 May 2018

Some Thoughts On MV HV Heat Shrink Cable Joints & Cable Terminations

uploaded by Chris Dodds - Thorne & Derrick Sales & Marketing Manager Although modern cable manufacturing technologies evolve and develop the essential factors to consider when installing heat shrink type joints or terminations on medium/high voltage power cable systems remain essentially unchanged. Materials quality allied with installation by competent trained...

Read More 

X
Logos
Tiled images
Associated manufacturers
X

Get a quote

Complete the form below to make an enquiry about products.

  • This field is for validation purposes and should be left unchanged.
  • Please enter your full name.
  • Please enter your contact telephone number.
  • Please enter your e-mail address.
  • Please select if you are enquiring about products for the UK or for export.