LSF Mains Straight Resin Filled Joint 185-300sqmm 4 Core SNE

Published 07 Sep 2020

Image: Daniel Betts – 33KV 11KV LV Cable Jointer at Western Power Distribution

Pictured: LSF Mains Straight Resin Filled Joint 185-300sqmm 4 Core SNE

LSF Mains Straight Resin Filled Joint 185-300 4 Core SNE

Resin Filled Joint

The 3 part resin cable joint shows the neutral conductor with the blue core at the bottom of the cable joint. The earth wires from both sides of the cable joint are in a BCNE connector with an equalisation bond and copper earth tail – they are required to extend out from the connector 5mm either side of the cable. A black mastic water block is wrapped around the earth tail by the cable jointer.


Jointers blog

Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

15,000+ Subscribers. âž¡ Joints Terminations Cleats Lugs MV HV 11kV 33kV