Blog

Thorne & Derrick’s POWER Blog is regularly updated with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

➡ View T&D’s brochure – contact our Sales Team with your requirements.

We focus on Product CategoriesDuct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder PillarsCable Joints LV | Joints & Terminations MV HV 

We provide guidance and technical support for the installation of LV, MV & HV Cable Joints, Terminations, Substation & Electrical Equipment from our Key Suppliers including:

3M CMP Ellis Patents
Nexans Euromold Elastimold Pfisterer
Prysmian Alroc CSD
Roxtec CATU Electrical Cembre
Lucy Zodion ABB Emtelle

MV HV Cables 11kV 33kV

With Photo Blog contributions from our social network of utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

JOINT ♦ TERMINATE ♦ CONNECT ♦ GLAND ♦ CLEAT ♦ CRIMP ♦ DUCT ♦ SEAL ♦ REPAIR ♦ CABLE ♦ SPLICE ♦ INSULATE


Nexans Windlink® Cables To Electrify The Future Of Onshore Wind Turbines

Published 26 Mar 2021

Nexans Windlink® Cables To Electrify The Future Of Onshore Wind Turbines

Vestas turns to Nexans Windlink® Two-year contract will see around one million Windlink cable kits installed inside Vestas turbines across the globe A local extended supply chain to match Vestas global footprint while reducing carbon impact A successful partnership for the development of the EnVentus platform thanks to our...

Read More 

Offshore Substation High Voltage Cable Re-alignment

Published 26 Mar 2021

Offshore Substation High Voltage Cable Re-alignment

High Voltage Cable Re-alignment Offshore Substations Special thanks to Geoff Briggs MIET from MGL Cable Services for the kind permission to republish this short case study in Wind Energy Network When substation high voltage cable routing design and installation specifications do not align, MGL Cable Services bring expertise and...

Read More 

Transformer Hi-Side PILC Cable Termination Chamber With Stress Cones

Published 26 Mar 2021

Transformer Hi-Side PILC Cable Termination Chamber With Stress Cones

Image Courtesy of: John McGaughan, Safety Manager/U.G. Cable Systems Operation Specialist-NCCER/FACTE Certified Training Instructor at Barrow Power LLC. Pictured: Transformer Hi-Side PILC Cable Termination Chamber With Stress Cones TECO & PILC Cable “We only replace PILC cable that goes bad. We have about 95% in our Network system downtown....

Read More 

Cable Jointing – An Art or Science?

Published 26 Mar 2021

Cable Jointing – An Art or Science?

Both. Whether lashing in a Straight 6 resin joint to power a domestic shower or jointing 110kV cables to energise Brisbane, the cable jointer must concentrate during all stages of cable stripping, measurement and joint installation. Make an error with your measure, flirt with failure. Of course cable failures keep cable...

Read More 

Associated manufacturers
X

Get a quote

Complete the form below to make an enquiry about products.

  • This field is for validation purposes and should be left unchanged.
  • Please enter your full name.
  • Please enter your contact telephone number.
  • Please enter your e-mail address.
  • Please select if you are enquiring about products for the UK or for export.