Blog

PFISTERER TENSOREX C+ | The Patented Spring Automatic Tensioning System for Rail Systems

January 23rd, 2020
PFISTERER TENSOREX C+

PFISTERER TENSOREX C+

PFISTERER TENSOREX C+

Automatic Tensioning System for Rail Systems

  • uploaded by Chris Dodds | Thorne & Derrick Sales & Marketing Manager

PFISTERER TENSOREX C+ is an automatic tensioning system that uses the force of a coil spring to constantly tension the railway catenary and/or bearer cable.

The TENSOREX C+ is a patented spring automatic tensioning system which has been installed on many worldwide prestigious rail and tramway systems. It therefore effectively compensates the expansion caused by fluctuating daytime and night-time temperatures as well as the change in the seasons while keeping the tension at a constant level.

Applications

  • For railways and tramways
  • Best solution for portals, tunnels and platforms
  • Inner-city installations where low visual impact is requested

Facts

  • Units Sold: 14,000+ (Asia, Africa, Australasia, Europe, North and South America)
  • Compensating Length: 450-1100 mm
  • Line Tension Force: 7.5-40 kN
PFISTERER TENSOREX C+

PFISTERER TENSOREX C+

PFISTERER TENSOREX C+ Advantages:

Highest reliability:
Every TENSOREX C+ unit is tested before shipping to the customer

Compact design:
Easy handling and transportation
Esthetical solution for inner-city installations

Fast installation
Delivered ready to install, no assembly required, no weights have to be installed

No tensioning weights required:
Vandal resistant
Free space on the mast base – escape routes are not blocked

Maintenance-free

High precision
Constant tightening force over the entire regulation range
Fast and precise response – very small traction force hysteresis

Purely mechanical system
Requires no additional power supply. No influences due to temperature changes

Reduced risk of vandalism / theft

Low impact aesthetics

Suitable for tunnels / areas of limited space

Mounting solutions available for all applications

Reusable in the event of wire failures

How it Works

By means of a support cable, TENSOREX C+ exerts a constant tension on the contact wire, regardless of any changes in length due to temperature. The special spiral spring is firmly connected to two cams on the same shaft. The degree of rotation of the shaft results in a linear variable torque/moment, which is compensated for by the combination with the variable radius of the cam.

This produces a constant pulling force over the entire device working range.

PFISTERER TENSOREX C+

PFISTERER TENSOREX C+ | How it works?

FContact wire = f (M/r) = const.

F
Contact wire >> Force on contact line
MSpring >> Torque/moment applied by spring (variable on linear basis)
rPulley >> Radius of cam (variable)
lWork >> Device working range correspond to variable pulley profile length

PFISTERER TENSOREX C+ Technical Data

Pfisterer Part Number  N/A 000 700 439
Pull force (kg) 1200
Pull force (kN) 11.8
Compensating length (mm) 750
Spring quantity N/A 3
Weight (kg) 150
Width (mm) 429
PFISTERER TENSOREX C+- Automatic Tensioning System for Rail Systems

PFISTERER TENSOREX C+- Automatic Tensioning System for Rail Systems

Stockists & Suppliers

THORNE & DERRICK

Thorne & Derrick are national distributors of LV, MV & HV Cable Installation, Jointing, Substation & Electrical Equipment – servicing businesses involved in cabling, jointing, substation, earthing, overhead line and electrical construction at LV, 11kV, 33kV, 66kV and EHV. Supplying a complete range of power cable accessories to support the installation and maintenance of low/medium and high voltage cable systems:

  • Slip-on Cable Terminations
  • Cold-shrink Cable Terminations
  • Heat-shrink Cable Terminations
  • Cable Joints – Heat & Cold-shrink
  • Separable Connectors (Euromold)
  • Surge Arresters & Switchgear/Transformer Bushings

Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV 

Thorne & Derrick International

IEC 61482-2 2018 – Get Up To Speed With The New Arc Flash Standard

January 23rd, 2020

IEC 61482-2:2018 - ProGARM

Arc Flash Protection

IEC 61482-2:2018

Article Courtesy of ProGARM Arc Flash Protection & Clothing 

A new test standard for arc flash protection – IEC 61482-1-1:2018 – was introduced in May 2019, which means arc flash protective garments certified after May 2019 have to be tested under these new, more stringent conditions under the PPE regulation.

This is a result of the updates to the Arc Flash standard for garments, IEC 61482-2:2018, which was released in 2018.

IEC 61482-2:2018

This standard is significantly different to FR standard EN ISO 11612. It includes more rigorous and different requirements, and is the standard for garments to protect those at risk of Arc Flash. The latest update to the standard was in 2018 and contained a couple of important changes to the test methods with regards to the performance ratings of garments.

The new test results in a new way of rating arc flash clothing, ELIM (Energy Incident Limit), which will be used as a further arc rating performance property value and as a more stringent performance indicator of both fabric and garments.

♦ IEC 61482-1-1:2019 Live Working – Protective clothing against the thermal hazards of an electric arc – Part 1-1: Test methods – Method 1: Determination of the arc rating (ELIM, ATPV and/or EBT) of clothing materials and of protective clothing using an open arc.

Arc Flash PPE

ProGARM | Functional Arc Flash Clothing, Protection & PPE For Everyday Wear

As a result of this ProGARM have written a short guide to the new IEC 61482-2:2018 standard to highlight the key bits of information you need to be aware of when reviewing your PPE specification and the key terminology that you need to understand.

Choosing the right PPE for your team can be difficult and with all the standards to consider it can feel quite overwhelming. This guide aims to help people make a more informed decision about what PPE is best for you.

You can download the PDF guide via this link or see the attached pdf below.

Arc Flash Clothing Protection

Arc Flash Clothing | Polo Shirts | Jackets | Coveralls | Trousers | Sweatshirts | Helmets

With the recent changes to the IEC 61482-2 standard, ProGARM outline the key changes and unpack the details to help you understand the important information that impacts you.

SCOPE

Learn about what this standard covers and why it’s important to have an understanding of it when working with or near live electricity.

TEST METHODS

Understand the two test methods used within this standard and how they contribute to providing calorific and class values to identify the level of protection different products provide.

CALORIFIC VALUES EXPLAINED

ATPV, EBT50, ELIM. What’s the difference?

We explain the differences between each calorific value, how they are calculated and what to look for when specifying PPE for your team.

PROGARM, THE ARC FLASH SPECIALISTS

ProGARM are a the leading UK manufacturer of high quality Flame Resistant & Arc Flash Clothing, garments and workwear – they work successfully with their UK Distributor Thorne & Derrick to save lives and reduce accidents.

ProGARM Ladies Arc Flash Clothing

Thorne & Derrick are proud to be distributors of ProGARM arc flash clothing and protection.

We can help – should you require arc flash calculators or advice on the type of clothing and protection available please do not hesitate to contact us.

Further Reading
THORNE & DERRICK

Thorne & Derrick are national distributors of LV, MV & HV Cable Installation, Jointing, Substation & Electrical Equipment – servicing businesses involved in cabling, jointing, substation, earthing, overhead line and electrical construction at LV, 11kV, 33kV, 66kV and EHV. Supplying a complete range of power cable accessories to support the installation and maintenance of low/medium and high voltage power systems:

  • Slip-on Cable Terminations
  • Cold-shrink Cable Terminations
  • Heat-shrink Cable Terminations
  • Cable Joints – Heat & Cold-shrink
  • Separable Connectors (Euromold)
  • Surge Arresters & Switchgear/Transformer Bushings

Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV 

 


Arc Flash Learning & Resources

Arc Flash

Thorne and Derrick are proud to be distributors of ProGARM arc flash coveralls and protection.

We can help – should you require arc flash calculators or advice on the type of clothing and protection available please do not hesitate to contact us.

Arc Flash Trousers Category 2 10 Cal Hi Vis Orange Arc Flash Trousers Category 2 9 Cal Arc Flash Trousers Category 2 9.5 Cal Arc Flash Lineman Coverall Category 2 9.5 Cal
ProGARM 4690 Coverall ProGARM 4616 Trouser ProGARM 5816 Trouser ProGARM 7638 Trouser ProGARM 6458 Coverall
Arc Flash Trousers Category 2 9.5 Cal Hi Vis Yellow Arc Flash Coveralls Category 2 9.5 Cal Hi Vis Yellow Arc Flash Polo Shirt Category 1 Hi Vis Orange Arc Flash Coveralls Category 2 12 Cal Arc Flash Polo Shirt Category 1 Hi Vis Yellow
ProGARM 7418 Trouser ProGARM 7480 Coverall ProGARM 5290 Polo Shirt ProGARM 6444 Coverall ProGARM 5286 Polo Shirt

T&D Logo

110kV Oil Filled Taihan High Voltage Cable Joints

January 22nd, 2020

Pictured below : 110kV Oil-Filled 800sqmm BICC Cable To 1000sqmm Taihan Cable Using Taihan EHV Cable Joints.

HV Cable Jointer : Andrew Brezovszky (EHV Cable Jointer at Energex Australia).

Taihan develop and manufacture the highest-quality products in the power, communications and materials industries.

Thorne & Derrick Specialist Electrical Distributor Established since 1985, T&D distribute the most extensive range of LV, MV & HV Cable Jointing, Terminating, Cable Pulling & Installation Equipment - contact us today for a competitive quotation. Key Products : MV Joints & Terminations, Cable Cleats, Duct Seals, Cable Transits, Underground Cable Protection, Jointing Tools, Feeder Pillars, Cable Duct, Earthing & Lightning Protection, Electrical Safety, Cable Glands, Arc Flash Protection & Fusegear. Distributors for : 3M, Pfisterer, Nexans Euromold, Elastimold, Catu, Roxtec, Emtelle, Centriforce, Lucy Zodion, Alroc, Hivotec, Cembre, Prysmian, Ellis Patents, ABB & Furse.

110kV Oil Filled Taihan High Voltage Cable Joints

Cable joint ready for outer protection boxes and encapsulating resin

110kV Oil Filled Taihan High Voltage Cable Joints

Cable joint cases positioned. Saving some room for the next feeder

110kV Oil Filled Taihan High Voltage Cable Joints

110kV Taihan Oil Joints – Bonding Leads Made Off

110kV Oil Filled Taihan High Voltage Cable Joints

Taihan 110kV Oil Cable Joints

Pictured are 800sqmm cables “cut & cap” ready for cable jointing. The abandoned side will be recovered at a later stage hence the platforms.110kV Oil Filled Taihan High Voltage Cable Joints

Taihan – EHV Cable Joints & Cable Terminations

XLPE Cable Accessories

  • Pre-Molded Joint Pre-Molded Joint (110kV – 161kV)
  • Pre-Molded Joint (220kV – 275kV)
  • Pre-Molded Joint (330kV – 400kV)
  • Outdoor Termination (EB-A)
  • Outdoor Termination (110kV – 161kV)
  • Outdoor Termination (220kV – 275kV)
  • Outdoor Termination (330kV – 400kV)
  • SF6 Gas Insulated Termination (EB-G)
  • SF6 Gas Insulated Termination (110kV – 161kV)
  • SF6 Gas Insulated Termination (220kV – 275kV)
  • SF6 Gas Insulated Termination (330kV – 400kV)
  • Oil-Filled (O.F) Cable Accessories

Taihan high voltage transition joint is applicable for jointing single core oil-filled (O.F) cable to single core XLPE cable. The 3-core oil-filled cable can be connected by using a splitter box (trifurcating joint box). The prefabricated and dry (oil-less) configuration is used on the XLPE cable side while on the oil-filled cable side conventional oil impregnated paper roll and newly adopted epoxy bell mouth is applied to complete the compact cable joint design.

 

Pictured: EHV High Voltage Transition Joint110kV Oil Filled Taihan High Voltage Cable Joints

Jointers blog

Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

15,000+ Subscribers. âž¡ Joints Terminations Cleats Lugs MV HV 11kV 33kV

Installing Bank Of Medium Voltage Westinghouse Regulators To Overhead Line

January 22nd, 2020

Image Courtesy of: Ricardo Heron (Utilities Professional)

Pictured: Installing Bank Of Medium Voltage Westinghouse Regulators To Overhead Line

Installing Bank Of Medium Voltage Westinghouse Regulators To Overhead Line Installing Bank Of Medium Voltage Westinghouse Regulators To Overhead Line

Jointers blog

Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

15,000+ Subscribers. âž¡ Joints Terminations Cleats Lugs MV HV 11kV 33kV

Masterclass – 132kV ABB Cable Termination

January 22nd, 2020

By Chris Barker EHV Jointer

ABB 132kV Cable Terminations

Before we start, let us establish Chris Barker is an international class EHV Jointer conversant with the skills and techniques required for the safe jointing and terminating of cables using ABB, NKT, Tyco, Pfisterer, Prysmian, Ericsson and Nexans. ABB

Whether you are reading this as a recruiter, jointer, friend or follower of Chris you can review his skill set in the following Photo Blog collection.

1, Stress Cone & Connector Taped Up – tinned copper mesh is carefully applied to the stress cone by the Jointer, then 5 layers of self-amalgamating tape are overlayered with two layers of PVC electrical insulation tape.

Stress Cone & Connector Taped Up

2. Ready For Insulator To Be Bolted Up notice the highest level of care and attention is required by the cable jointer while the cable termination installation progresses, at each stage of the process the jointer is delicately padding the cable to remove any dirt, debris or particles that will potentially cause damage to the cable or accessory.

Ready For Insulator To Be Bolted Up

3. 3 x ABB 132kV Cable Terminations Plugged In Without Problems – next stage is to install the copper pipework and fill with insulating oil.

ABB 132kV Cable Terminations Plugged In Without Problems

4. Preparation Of Semi- Conductive Screen Cut On 132kV XLPE EHV Cable – also known as “glassing”, this highly dexterous and skillful task is a key step in the EHV cable preparation process. Chris is pictured using microscope slides for cable glassing, although some jointers prefer welding glass mask inserts.

This basic staple of the EHV jointers tool kit is also complemented by the use of latest precision engineered cable jointers tools. In this application, the semi-conductive screen was accurately removed by a Hivotec peeling and stripping tool to 100mm from the actual mark, the remainder was removed with traditional glass.

Preparation Of Semi- Conductive Screen Cut On 132kV XLPE EHV Cable

Hivotec CP90 & CP130 cable jointing tools are used by EHV jointers for peeling the semi-conductive screen and for stripping the main XLPE insulation from high voltage power cables.

Masterclass - 132kV ABB Cable Termination

5. Old Cables Cut, New Cables Heated & Straightened – ready for cable terminations. ABB 132kV cable terminations with be installed horizontally, plugged in and then filled with electrical insulating oil. Although the existing cables had not suffered a cable fault the client upgraded the circuits to extend the service life of the 132kV power distribution system – cable heaters were used to provide straightening to the HV cables.

4. Old Cables Cut, New Cables Heated & Straightened - ready for cable terminations. ABB 132kV cable terminations with be installed horizontally, plugged in and then filled with electrical insulating oil. Although the existing cables had not suffered a cable fault the client upgraded the circuits to extend the service life of the 132kV power distribution system.

6. Taping Up Connector With Semi-Conductive Electrical Tape (3M Scotch 13 Tape) – a screw connector to a torque of 45NM is applied. Once insulator is installed the cable jointer fits a cap on the top which is then plugged in with bolts directly to the top cap. When the 132kV cable termination is completed it is filled with polybutene oil and sealed up prior to final connection to transformer.

Taping Up Connector With Semi-Conductive Electrical Tape (3M Scotch 13 Tape)

7. 132kV Cable Termination Plugged-in & Filled – ready for final connection the 132kV cable termination is installed to the transformer side and insulated with oil. The connection is made via a flexible section of copper braid bolted to the cable termination inside the 132kV transformer.

132kV ABB Cable Termination

8. 132kV ABB Cable Termination Completed.7. 132kV ABB Cable Termination Completed.

9. Hometime

132kV ABB Cable Termination

Jointers blog

Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

15,000+ Subscribers. âž¡ Joints Terminations Cleats Lugs MV HV 11kV 33kV

Associated manufacturers
Share this page
Share this page
X

Get a quote

Complete the form below to make an enquiry about products.

  • This field is for validation purposes and should be left unchanged.
  • Please enter your full name.
  • Please enter your contact telephone number.
  • Please enter your e-mail address.
  • Please select if you are enquiring about products for the UK or for export.