Subsea Cable Protection Systems

♦ Republished by Chris Dodds 

with Kind Permission of Greg Campbell-Smith ((Director Sales and Business Development at First Subsea)

Subsea Cables

 

 

First Subsea is the world’s leading developer of subsea connection technology, supplying, installing and decommissioning.

Subsea power cables on offshore wind farms are typically protected by means of burial.

This is a well proven means of cable protection used in other offshore industries.

However, at either end of offshore wind array cables they transition from burial, up through the water and into the wind turbine foundation. This free spanning section of cable is susceptible to what can be substantial wave and current loads.

These loads introduce movement and bending into the subsea cable which, without cable protection, can lead to over-bending, over-tensioning, fatigue and abrasion damage.

This exposed subsea cable is traditionally ‘protected’ by means of a relatively expensive and complex proprietary Cable Protection System (CPS).

Our 2nd Article on Subsea Cable Protection Systems focuses on Subsea Cable Protection & Laying Costs.

As part of our product awareness feature on Cable Protection Systems we look at the time taken to install, focusing on the critical path timings, that impact on the installation costs.

Cable lay construction vessels command market rates in excess of €150,000 a day, due to their ability to reel, carry and deploy cable using dynamic positioning, this figure excludes crew/fuel.

Most large cable lay vessels have the ability to pre-assemble and prepare the cable protection system on the runway off the critical path as they perform other operations, so the deck preparation times which take on average an hour have been discounted.

The critical path clock for the CPS product starts as it is deployed over the chute located at the stern of the vessel. The graph shown below shows the times for a number of cable pull ins with a crew new to our system. Our quickest time was 38 minutes from overboarding to connection.

After the first few pull-ins the team averaged 45 mins. From first hand observations on another CPS we saved over an 1hr on critical path.

Saving an hour on critical path, could provide a saving of €7,000, small change you may think. Think again Typically 150 CPS per project could save over €1,000.000 When selecting CPS consider the overall CAPEX not just the product cost.

Subsea Cables Protection | Further Information

 

➡ If you would like a copy of the report, please contact Chris Dodds [email protected] 

Subsea Cable Protection & Laying Costs

LV, MV & HV CABLE JOINTING, EARTHING, SUBSTATION & ELECTRICAL EQPT

Thorne & Derrick are Specialist Distributors to the UK and international Offshore Wind & Renewable industry to provide safe and reliable LV HV Electrical Cable & Power Distribution Systems – we are highly customer responsive and absolutely committed to providing a world-class service.

We have an International Distribution Agreement with Nexans Power Accessories UK to supply their Heat Shrink and Cold Applied ranges of 11kV/33kV/66kV joints and terminations and Euromold brand of separable connectors.

Since 1985, we have established an international reputation based on Service, Integrity and Trust – contact us.

t: 0191 410 4292 | e: [email protected] | www.powerandcables.com

We provide expert technical support and supply from a multi-million pound stock holding:

  • Cable Joints, Terminations & Connectors Earthing & Lightning Protection
  • Cable Accessories – Lugs, Glands
  • Circuit Protection & Fuses
  • Cable Cleats & Clamps Electrical Safety Equipment
  • Cable Pulling & Laying Equipment
  • Arc Flash Protection & Clothing
  • Cable Duct Seals & Transit Systems Surge Arresters & Bushings

Further Reading:


Subsea Cable Protection Systems

♦ Republished by Chris Dodds 

with Kind Permission of Greg Campbell-Smith ((Director Sales and Business Development at First Subsea)

Subsea Cables

 

 

First Subsea is the world’s leading developer of subsea connection technology, supplying, installing and decommissioning.

Subsea power cables on offshore wind farms are typically protected by means of burial.

This is a well proven means of cable protection used in other offshore industries.

However, at either end of offshore wind array cables they transition from burial, up through the water and into the wind turbine foundation. This free spanning section of cable is susceptible to what can be substantial wave and current loads.

These loads introduce movement and bending into the subsea cable which, without cable protection, can lead to over-bending, over-tensioning, fatigue and abrasion damage.

This exposed subsea cable is traditionally ‘protected’ by means of a relatively expensive and complex proprietary Cable Protection System (CPS).

Our 1st Article on Subsea Cable Protection Systems and how they provide real time cost savings offshore.

First Subsea Cable Protection System was recently installed on an Offshore Wind Farm in the Southern North Sea and received commendations from the Developer and Installation Contractor alike.

“The engagement system worked very well, 100% connection, quick and efficient installation times” We will be posting several articles on LinkedIn over the next few weeks detailing how we have made Cable Protection easier, quicker, consistent whilst ensuring the cable is fully protected from fatigue and environment challenges over its lifetime offshore.

 

➡ If you would like a copy of the report, please contact Chris Dodds [email protected] 

Subsea Cable Protection Systems Installed On Offshore Wind Farm

 

LV, MV & HV CABLE JOINTING, EARTHING, SUBSTATION & ELECTRICAL EQPT

Thorne & Derrick are Specialist Distributors to the UK and international Offshore Wind & Renewable industry to provide safe and reliable LV HV Electrical Cable & Power Distribution Systems – we are highly customer responsive and absolutely committed to providing a world-class service.

We have an International Distribution Agreement with Nexans Power Accessories UK to supply their Heat Shrink and Cold Applied ranges of 11kV/33kV/66kV joints and terminations and Euromold brand of separable connectors.

Since 1985, we have established an international reputation based on Service, Integrity and Trust – contact us.

t: 0191 410 4292 | e: [email protected] | www.powerandcables.com

We provide expert technical support and supply from a multi-million pound stock holding:

  • Cable Joints, Terminations & Connectors Earthing & Lightning Protection
  • Cable Accessories – Lugs, Glands
  • Circuit Protection & Fuses
  • Cable Cleats & Clamps Electrical Safety Equipment
  • Cable Pulling & Laying Equipment
  • Arc Flash Protection & Clothing
  • Cable Duct Seals & Transit Systems Surge Arresters & Bushings

Further Reading:


enspec power

 ➡ The following article has been prepared by Tim Rastall from Enspec Powertim rastall enspec power

“As a Senior Electrical Engineer specialising in Grid Code Compliance and power quality solutions, I help wind, solar, energy storage and industrial connections comply with required standards and operate in an efficient and cost-effective manner.

At Enspec Power we specialise in the design, manufacture, installation and maintenance of Grid Code Compliance solutions and as such are able offer a bespoke and turnkey solution for any connection.

If you would like to find out more about our innovative solutions or how we could help you, please call me on 07481818740 or email me at [email protected].”

SynchroTeq – Transformer Switching

This report was produced by Enspec Power Ltd, it details the application of the SynchroTeq device for transformer switching. The document outlines the application and theory of controlled transformer switching and then presents two commissioned and operational site examples, one from a UK Solar Farm and another from a Wind Farm in Scotland.

In conclusion, the document demonstrates how the SynchroTeq can mitigate inrush currents during the energisation of transformers and provide site compliance with the P28 limit of 3%.

Introduction

When a transformer is energised it may draw a large transient current from the supply connection point. This large current draw results in a voltage dip. According to the UK standards (Electricity Council’s Engineering Recommendation P28), this voltage dip cannot exceed a specified amplitude and/ or duration. Due to this, it has been common practice to install a Pre-insertion Resistor (PIR), that is placed in the circuit during the transformer energisation to reduce the inrush current and thus voltage dip.

However, a PIR requires an extra circuit breaker, has a significant footprint and can be expensive. The SynchroTeq is a controlled switching device that can provide equal or better inrush mitigation to that of a PIR without the need for an extra breaker or costly install.

This document will cover the theory, installation and performance of the SynchroTeq when applied to transformer switching and will end by presenting two operational SynchroTeq installations.

Transformer Controlled Switching

When a transformer is de-energised, the magnetic core will contain a certain amount of residual magnetic flux. This residual flux is dependent on the voltage across the transformer at the time of de-energisation and can intensify saturation leading to high transient inrush current on re-energisation. The possibility or magnitude of saturation and thus inrush current is dependent on the point of re-energisation (angle) in relation to this residual flux. This effect can be seen graphically in Figure 2-1 below.

Inrush Current due to Opening and Subsequent Closing Angle

Figure 2-1 – Inrush Current due to Opening and Subsequent Closing Angle

The above Figure 2-1 shows the inrush current obtained across all possible closing angles for each possible opening angle. As can be seen, there is a best and worst-case closing angle for each opening angle. When switching a standard transformer arrangement there is an equal possibility of hitting a bad point as a good point, and thus a possibility of high inrush current. The SynchroTeq works by monitoring and calculating this residual flux, with knowledge of the residual flux it can calculate the optimum closing angle. This is seen graphically in Figure 2-1 above as ‘SynchroTeq path’.

The SynchroTeq then becomes an interface between the open/ close commands (manual, remote or protection) and the Circuit Breaker. Using the calculated residual flux and knowledge of the Circuit Breaker operation time, the SynchroTeq can target this optimum closing angle, thus mitigating high inrush currents. This process can be seen graphically in Figure 2-2 below.

SynchroTeq Controlled Close Operation (Phase A)

Figure 2-2 – SynchroTeq Controlled Close Operation (Phase A)

The above Figure 2-2 shows a closing operation carried out via the SynchroTeq (Phase A). In this example, the calculated closing angle, based upon the calculated residual flux, is around 220 degrees. Firstly, the close command for the CB is issued to the SynchroTeq, the SynchroTeq then waits until the target angle is the CB closing time ahead (predicted operating time), and then the close command is sent to the CB. The result here is the CB closing at the desired angle with minimum inrush current.

The SynchroTeq can mitigate inrush current using any modern CB. The CB can be a 3-pole gang operated device or a 3-pole individual pole device. When operating via a 3-pole gang operated device, the SynchroTeq cannot close the CB at the optimum point for each phase, in this instance, it calculates the optimum point for all three phases to keep inrush current to a minimum. When operating via an individual pole device inrush current can be completely avoided for unloaded transformers.

SynchroTeq Application

SynchroTeq Signal Requirements

Figure 3-1 – SynchroTeq Signal Requirements

The above Figure 3-1 shows the signal requirements for transformer switching with a SynchroTeq device. The single-phase VT is used for voltage synchronisation, the CT’s are used to measure inrush current and the three-phase VT allows the SynchroTeq to calculate residual flux. The SynchroTeq then forms an interface between the circuit breaker open/ close commands and the circuit breaker itself.

Actual Application and Results

UK Solar Farm

The following results are for a SynchroTeq MVX installed on a UK solar farm.

The SynchroTeq was used to control the simultaneous energisation of the sites 2MVA and 1.77MVA 11/04kV transformers. A diagram of the site layout can be seen below in Figure 4-1.

Site SLD Synchrotech MVX UK solar farm

Figure 4-1 – Site SLD

The SynchroTeq MVX was mounted in the client substation and controlled the energisation of the main CB. The initial P28 studies for the site highlighted a 50th percentile voltage dip of 8.2% for the simultaneous energisation of the sites transformers, this can be seen below in Figure 4-2.

PCC Voltage Dip for Whole Site Energisation

Figure 4-2 – PCC Voltage Dip for Whole Site Energisation

The DNO for this site stipulated a maximum voltage dip at the PCC of 6% due to the whole site energisation. The below Figure 4-3 shows the result of the SynchroTeq MVX commissioning:

Commissioned SynchroTeq Inrush Current

Figure 4-3 – Commissioned SynchroTeq Inrush Current

As can be seen from the above figure the resultant inrush current was 0.51PU (101A).

This resultant inrush current was then used to obtain a new voltage dip using the original P28 simulation model.

SynchroTeq Resultant Inrush Current in P28 Model

Figure 4-4 – SynchroTeq Resultant Inrush Current in P28 Model

 

Simulated Voltage Dip Based on SynchroTeq Inrush Current

Figure 4-5 – Simulated Voltage Dip Based on SynchroTeq Inrush Current

As can be seen from the above figures, simulation of the resultant inrush current led to a PCC voltage dip of 0.4%. As the switching is now controlled by the SynchroTeq this level of inrush current will result from every future energisation, making the site fully P28 compliant.

Scottish Wind Farm

The following results are for a SynchroTeq Plus installed on a Scottish Wind farm. The SynchroTeq was used to control the energisation of the sites 90 MVA 132/33kV transformer. Figure 4-6 below shows the layout of the site.

Site SLD SynchroTeq Plus installed on a Scottish Wind farm

Figure 4-6 – Site SLD

The SynchroTeq Plus was mounted in the 132kV control room and controlled the energisation of the main 132kV CB. The initial P28 studies for the site highlighted a maximum voltage dip of 17.9% for the energisation of the sites transformer, this can be seen below in Figure 4-7.

PCC Voltage Dip for 90MVA Transformer Energisation

Figure 4-7 – PCC Voltage Dip for 90MVA Transformer Energisation

The DNO for this site stipulated a maximum voltage dip at the PCC of 6% due to the transformer energisation. The below Figure 4-8 shows the result of the SynchroTeq Plus commissioning.

Commissioned SynchroTeq Inrush Current

Figure 4-8 – Commissioned SynchroTeq Inrush Current

As can be seen from the above figure the resultant inrush current was 0.3PU (118A). A fast-acting voltage recorder was also connected to the 132kV VT and the recording during this switching event can be seen below in Figure 4-9.

Recorded Voltage Dip During SynchroTeq Energisation

Figure 4-9 – Recorded Voltage Dip During SynchroTeq Energisation

As can be seen from the above figures, after commissioning of the SynchroTeq the obtained PCC voltage dip was 0.63%. As the switching is now controlled by the SynchroTeq this level of inrush current will result from every future energisation, making the site fully P28 compliant.

Conclusion

enspec power banner

In summary, it has been shown that by using the SynchroTeq device, inrush current caused by transformer energisation can be significantly reduced. Two installed and commissioned cases have been presented that show the potential of the SynchroTeq to ensure P28 compliance when initial system studies predict potential for large voltage dips.


See how Thorne and Derrick support the Wind and Solar industries.thorne and derrick wind industry

thorne and derrick solar industry


 

THORNE & DERRICK

Thorne & Derrick are national distributors of LV, MV & HV Cable Installation, Jointing, Substation & Electrical Equipment – servicing businesses involved in cabling, jointing, substation, earthing, overhead line and electrical construction at LV, 11kV, 33kV, 66kV and EHV. Supplying a complete range of power cable accessories to support the installation and maintenance of low/medium and high voltage power systems:

  • Slip-on Cable Terminations
  • Cold-shrink Cable Terminations
  • Heat-shrink Cable Terminations
  • Cable Joints – Heat & Cold-shrink
  • Separable Connectors (Euromold)
  • Surge Arresters & Switchgear/Transformer Bushings

Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV HV 
Thorne & Derrick International

 

still a cable splicer

This article was wtitten by John Perez of Quanta Underground Power Services

See Part 1 “You’re Just A Cable Splicer!”

I still am and always will be proud to be a “Cable Splicer”, or as I commonly refer to myself; a dirty tattooed underground rat. There are many of us who proudly holds the title of Cable Splicer, and we have been through multiple training programs to achieve our title.

We are an important part of the electric distribution system anywhere multiple cables are installed in manholes, vaults, enclosures, and other types of Confined Spaces.

While I could, and maybe have a few times, go on for days about the importance of a well built underground distribution system installed by good Cable Splicers, we are here to talk about Splicers.Cable Splicer

Currently in the U.S.A., not sure about other countries, there is a shortage of Cable Splicers.

Over the last 2 year period, there isn’t a single week that goes by without someone asking me to refer a good Splicer.

Problem is; there are none available at this point. And the be brutally honest, if you are a Splicer and currently can’t find work, there are probably one of two things going on.

1 – You don’t want to travel

2 – Your reputation has preceded you

In recent years there has been a push to recognize the importance of Lineman and the dangerous work they perform. I am happy to see that Lineman and skilled trades are receiving the recognition they deserve.

During all of this wonderful recognition, we must not forget the Cable Splicer who does work which is equally as dangerous under equally difficult conditions.

Cable Splicers and the work we perform should not be considered “less than” simply because we don’t have the title of “Lineman”. I have met, and am friends with, multiple Lineman who would not consider working on cables in Confined Spaces, much the way I would not consider climbing a tower. So, much the same as the Lineman trade, the Cable Splicer trade is in high demand and does not have enough people to fill the needs.

My opinion may be unpopular and maybe even a bit biased, but it is high time for Cable Splicers to begin to receive recognition for the work we perform.

Without the Cable Splicer, the integral and vital underground electric distribution systems that power many large cities would not be maintained and repaired. The knowledge required for rigging, cable splicing, terminating, installing cables, removing cables, changing transformers, switching, reading maps, etc…. is valuable and necessary. There are more tasks that I should list, but that would take up too much time.

I know I already said it, but it bears repeating; Cable Splicers deserve more recognition than they currently are afforded.

Call me crazy if you will, but I believe I am correct.

I vote for National Cable Splicer Day to take place on 7/24/2020.

Further Reading

Cable Splicers

THORNE & DERRICK

Thorne & Derrick are national distributors of LV, MV & HV Cable Installation, Jointing, Substation & Electrical Equipment – servicing businesses involved in cabling, jointing cables, substation, earthing, overhead line and electrical construction at LV, 11kV, 33kV, 66kV and EHV. Supplying a complete range of power cable accessories to support the installation and maintenance of low/medium and high voltage power systems:

  • Slip-on Cable Terminations
  • Cold-shrink Cable Terminations
  • Heat-shrink Cable Terminations
  • Cable Joints – Heat & Cold-shrink
  • Separable Connectors (Euromold)
  • Surge Arresters & Switchgear/Transformer Bushings

Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV HV 
Thorne & Derrick International

 

cable splicer

This article was written by John Perez of Quanta Underground Power Services

See Part 2 “You’re Still Just A Cable Splicer!”

“Your Just A Cable Splicer?!?” was a question that I was once asked by a Lineman, in a very incredulous tone. My first thought was to tell this Cable Splicerperson off and to let them know that I was not “only a Cable Splicer” but that I was a very good cable splicer.

But then I realized that what I was going to say would fall on deaf ears. I instead responded, “Yes, I guess that I am just a cable splicer. But the truth is, I know more about cable splicing than you do. Maybe I could teach you a few things.”

I have been a Journeyman Cable Splicer since 1993.

Over the years I have learned that we all have our position that adds value to our trade. Whether you are a Groundman, Apprentice, Lineman, Cable Splicer, Operator, General Foreman, Superintendent, or another Classification everyone has a valuable roll on a crew or within a Company.

Most of us take for granted or talk down to, our Helpers and Groundman, but when we have a crew of all Journeyman, there tends to be a lot of arguing about who will perform clean up tasks. Also, I don’t know of too many Journeyman (of any kind) who wants to go out and dig holes, pole holes, splice pits, transformer vaults, etc…

I have always felt that working together as a crew and teaching those around you, regardless of how many years of experience the other person may have, has always been the best way. None of us know everything about our chosen trade and you should worry about the people who say that they do. You can almost always learn something from someone else, good or bad. Passing on bad work habits or a bad work ethic is really no longer acceptable. This holds especially true, now, for those of us who are Union members. Currently, there is more than one Presidential Candidate who would like to make every State “Right To Work”.

Don’t take for granted our fellow workers within whatever Brotherhood you belong to. Raise the bar of excellence within yourself and I guarantee that your peers will follow, or they will move on. Safety and Quality must always be at the forefront of our work. We should never leave a potential trap for those who may follow us. Besides the person who follows your poor work could be you.

Further Reading

Cable Splicers


THORNE & DERRICK

Thorne & Derrick are national distributors of LV, MV & HV Cable Installation, Jointing, Substation & Electrical Equipment – servicing businesses involved in cabling, jointing cables, substation, earthing, overhead line and electrical construction at LV, 11kV, 33kV, 66kV and EHV. Supplying a complete range of power cable accessories to support the installation and maintenance of low/medium and high voltage power systems:

  • Slip-on Cable Terminations
  • Cold-shrink Cable Terminations
  • Heat-shrink Cable Terminations
  • Cable Joints – Heat & Cold-shrink
  • Separable Connectors (Euromold)
  • Surge Arresters & Switchgear/Transformer Bushings

Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV HV 
Thorne & Derrick International

 

Blog

Industrial Label Printing Solutions – Cembre MG4 & ROLLY3000 Guide

Published 18 Mar 2026

Industrial Label Printing Solutions – Cembre MG4 & ROLLY3000 Guide

INDUSTRIAL LABEL PRINTING SOLUTIONS When clear, durable and professional identification is required across control panels, cable systems, production facilities and industrial installations, print quality, reliability and ease of use are critical. Cembre industrial label printers are designed to support...

Read More

Associated manufacturers
Share this page
Share this page
X

Get a quote

Complete the form below to make an enquiry about products.

  • This field is for validation purposes and should be left unchanged.
  • Please enter your full name.
  • Please enter your contact telephone number.
  • Please enter your e-mail address.
  • Please select if you are enquiring about products for the UK or for export.