Cable Joint Installation Instructions

Sicame SBJ2/UPN

For details of cable preparation, the installation of mechanical connectors and associated components refer to the relevant sections of the UK Power Networks LV Jointing Manual opposite.

All dimensions in millimetres (mm).

  • Prepare the service cable using the plastic joint shell as a guide.
  • When the cable is ready to be put back together, connect all the copper wires together with the MF4/34A connectors. Use additional copper wires from a spare piece of cable of equivalent size, if there is gap between the cut ends.
  • Reconnect the two halves of the phase conductor using a MF4/28i connector.
  • Fit the cable joint shell, checking for a minimum clearance of 10mm between the joint shell and the completed cable joint
  • Fill the cable joint shell with the correct amount of Prysmian JEM resin as shown in the table below

Cable Jointing Materials

Cable Size (sqmm) UKPN Stores Code Sicame Cable Joint Kit Number Empty Shell Jointing Resin Volume
4 to 35sqmm 02708Q SBJ2/UPN 1.3 Litres
Cable Size (sqmm) UKPN Stores Code Sicame Cable Joint Kit Number Number Required Per Joint
4 to 35sqmm 02770X MF428I/UPN 1

♦ Note: LV Cable Joints are subject to change according to tender contract awards, manufacturer joint kit amends and new cable applications – always check with Thorne & Derrick that the kit referenced is the current approved and available cable joint.