April 2022 VOLTS!
Published 22 Apr 2022
Welcome to our industry bulletin – VOLTS.
So what is VOLTS?
VOLTS is our monthly round-up of industry news, projects, videos, technical tips, training information, promotions, webinars and career opportunities from Thorne & Derrick. Take a moment to Follow Us on LinkedIn to receive future VOLTS.
pROJECTS & NEWS
Thorne & Derrick Secure New Renewable MV Cable Accessory Order
This month, Thorne & Derrick International were delighted to confirm receipt of a new purchase contract order for an offshore wind farm project – this is to supply 33kV Tee Connectors (Nexans Euromold) and Inline Cable Joints (3M ColdShrink) following several rounds of technical qualification, specification and commercial submissions.
Thorne & Derrick’s technical submission for the jointing of the 33kV cables was accepted by the Senior Lead Cable Specialist based upon their 3M QS2000 range – the cable joint designed utilises a unique Cold Shrink delivery system. The 3M Cold Shrink products are supplied pre-stretched on a removable core for efficiency and ease of installation by the jointer with an integral electrical field control device and faraday cage pre-installed in the insulation body to reduce complexity during the installation.
As Approved Vendors to Vattenfall, the Swedish multinational power company, Thorne & Derrick will be supplying a 33kV Inter-Array Cable Accessory Package including medium voltage joints, connectors and cable cleats to support the installation of 19/33 (36)kV Single Core Submarine Cable with 24 Fibres (IEC 60502-2). Read more here.
52kV Trackside Power
Pictured Termination: 3M 95EP-631-2 is a 52kV Single Core Outdoor Termination utilising QTIII Technology for 26/45(52) kV Cables. Here’s a pallet shot of a Network Rail project order we have shipped out from Thorne & Derrick in April. The 52kV Cable Terminations manufactured by 3M Electrical utilising their innovative Cold Shrink Technology are Network Rail (NR) certified and PADS Listed as meeting the requirements for installation on their electrical infrastructure.
 Thorne & Derrick supply an extensive range of 400V-33kV Rail Cable Accessories & Power Distribution Sytems including feeder pillars to contractors undertaking Low Voltage Power Distribution, HV Electrification & Substations, DC Traction & Networks, OLE and Track Feeder Cable Renewals.
From stock, we deliver HV Terminations to trackside or turbine – whatever the industry, wherever the cable.
Further Reading: Joints & Terminations for Network Rail High Voltage Electrification Projects | PADS Approved
Preserving The Heritage
A heritage studio revived for the 21st Century
We are currently working on an exciting project with a heritage film studio, that is undergoing work to expand. The studio plans to expand the complex with new studios and workshops to bring it into modern times and continue use.
Thorne & Derrick are working with the client to provide cable protection and ducting solutions to assist with the expansion project.
Cable protection covers and underground warning tapes are installed over LV, MV and HV power cables in trench and ducted cable installations with high visibility colour providing a visual warning of danger when excavating cables.

Read more about Cable Protection
Thorne & Derrick also stock and distribute a range of cable ducting solutions that are independently certified to British and European Standards and are used extensively for LV, MV & HV substation, highways, housing developments, commercial, retail and industrial infrastructure applications. ➡ View the complete range of Cable Ducts to provide underground cable protection of low, medium and high voltage power cables (LV MV HV) including 11kV and 33kV cable ducting.
Technical Tips
Thorne & Derrick are the Specialist Distributor & Stockist for Alroc in the UK for their ranges of manual and motorised Cable Preparation & Jointing Tools for the removal and stripping of outer cable sheath, semi-conductor screen and insulation from LV, MV, HV and EHV power cables.
The ORACL manufactured by Alroc and supplied by Thorne & Derrick enables the cable jointer or user to longitudinally score the peelable semiconductive layer from medium/high voltage cables (typically 33kV up to 1000sqmm) in order to peel it off carefully by hand – this is a key stage of MV HV cable preparation prior to the installation of Power Cable Accessories including joints, terminations and connectors.
The ORACL screen scoring tool covers most “easy-strip” peelable semicon thicknesses by having adjustable scoring depths of 0.4, 0.6, 0.9 & 1.1mm – contact us for prices, stock availability or further information.
Anatomy of 33kV Cable
1 Aluminium Conductor with Water Blocking Protection | 2 Semiconducting Screen | 3 XLPE Insulation | 4 Semiconductng Screen | 5 Copper Wires Screen | 6 Copper Tape | 7 Water Blocking Tape | 8 PE Sheath
See Also from Alroc
- ALROC CWF3-60 – MV Peelable (Easy-Strip) Semicon Removal | Video
- ALROC CWB-18-60-MVS – MV Bonded Semicon Removal | Video

Stocked & Supplied by Thorne & Derrick
Featured Jointers

Read | Chris Barker |132kV Transition Cable Joint
Sector SpotlightÂ
eXPLOSIVE aTMOSPHERES
Thorne & Derrick are Specialist Distributors to the Oil & Gas industry of LV, MV & HV Cable Installation, Jointing, Substation & Electrical Equipment – since 1985 we have worked closely with EPC’S, E&P and related companies ensuring the highest levels of safety, reliability and maintainability of LV HV cable and power systems.
T&D hold the largest European stocks of 3M Hazardous Area Cable Accessories LV HV – this includes Cold Shrink and Scotchcast joints, terminations and abandonment kits for safe use in potentially explosive atmospheres up to 33kV.
Specialist Cable Joint & Repair Systems include submersible, hydrocarbon and fire resistant solutions for marine and offshore power, control and instrumentation cables.
We provide expert technical support and supply from a multi-million pound stock holding:
- Cable Joints, Terminations & Connectors
- Earthing & Lightning Protection
- Cable Accessories – Lugs & Glands
- Circuit Protection & Fuses
- Cable Cleats & Clamps
- Electrical Safety Equipment
- Cable Pulling & Laying Equipment
- Arc Flash Protection & Clothing
- Cable Duct Seals & Transit Systems
- Surge Arresters & Bushings
- Overhead Line & Substation Power Products
Selected Article | Repairing Damaged Cables, Cable Sheath & Jackets
Supporting Articles
- Submersible Cable Repair | Repair Damaged Offshore Firepump Cables
- Cable Repair Tape & Heat Shrink Sleeve From 3M Electrical For VFD Cables
- How To Abandon Cables Using 3M Cold Shrink Cable Abandonment Kits CSCAK
- 3M Cold Shrink Tubes For Electric Submersible Pump (ESP) Cable Repair
Shelf-to-Shelf
This April we shipped-out 50+ Resin-type low voltage power and instrumentation cable joints with hydrocarbon resistant Scotchcast resin suitable for installation in Zone 1/2 flammable gas atmospheres according to ATEX Directive – picked from the Bristol warehouse shelf destined overnight to the continental shelf of the North Sea.
If you need to joint, to terminate or to connect LV or HV cables, either onshore or offshore, whatever the cable, wherever the location: Thorne & Derrick can help.

Scotchcast Stocks | Jointing Systems for all types of Industrial Cables
Industry event
Dogger Bank Wind Farm: Meet the Buyer event
Jonathan Hewitt, Key Account Sales Engineer at Thorne & Derrick, enjoyed attending the Dogger Bank Wind Farm ‘Meet the Buyer Event’ organised by NOF. The event included presentations by Dogger Bank, Port of Tyne and North Star Renewables. The networking lunch and one-to-one meetings created a great opportunity to meet project managers and stakeholders to learn more about opportunities within the project.
About the Event
Dogger Bank Wind Farm and its Tier 1 Contractors are committed to the development and growth of a competitive UK supply chain. The meet the buyer event was held to showcase contract opportunities during the operations of this flagship UK development.
More about Dogger Bank
The Dogger Bank O&M Base is being constructed at the Port of Tyne and is due to be completed in Q4 2022. The project is the UK’s first HVDC connected wind farm and will feature the world’s first unmanned HVDC offshore platforms. North Star Renewables has been contracted to provide four Service Operation Vessels to the project. One rotation of GE’s Haliade-X turbine can power a UK household for two days. 277 units of the 13MW and 14MW turbines will be used on Dogger Bank.
Dogger Bank is a joint venture between SSE Renewables (40%), Equinor (40%) and Eni (20%).

Jonny Hewitt from Thorne & Derrick with Noman Shabir from Ellis Patents at the Dogger Bank – Meet The Buyer Event.
Top of The Posts
Prize Draw!
This month we are hosting a prize draw to win a PFISTERER special edition Centenary Book. We are delighted to celebrate 100 years of PFISTERER with the history of their role in the energy industry, dating back to 1921. Connecting power for the future.
Enter the prize draw here
PFISTERER meets future challenges with the knowledge that comes from one hundred years of experience. This expertise has developed continuously with advances in technology. Numerous innovations and patents continuously drive our growth with further investment in R&D planned for 2022 and beyond. Read more about our established relationship: Thorne & Derrick | Product Training With PFISTERER
Jobs
Meet Mane
Mane Contract Services are committed to working with their client partners to help create a greener and cleaner future. For over 20 years, they have provided project staffing solutions to the complete project lifecycle across all Energy sources. Mane have an extensive project and client portfolio across both cable manufacturing & installation, working across UK, EMEA, APAC and USA.
Â
Stephen Stuart and his team at Mane and they are looking to expand their network within the Wind Energy Industry;
Â
– HV Engineering & Installation – 33kV, 132kV, 155kV, 220kV, 400kV
– Commissioning Engineering / Commissioning Management
– Installation Management & Package Management
– Grid Connection and Cable Installation
– Project Management / Construction Management
– Client Representation
– Site Management & Support
– Document Control & Management
– Project Planning / Scheduling– Project Controls Management
– Health & Safety Management
If you are recruiting for yourself or looking for a new career move within the Renewables sector then please get in touch +44 (0) 1923 470 724Â or email: [email protected]
For more information – visit their jobs page; https://www.mane.co.uk/energy/
Â
With a network of international offices around the world and a large dedicated team of specialist Account Managers and Head Hunters, Mane are well placed to support your career development or recruitment requirements around the globe.
VOLTS! By,
Thorne & Derrick distribute the most extensive range of Low & High Voltage Cable Installation & Electrical Distribution Equipment to the Power Transmission & Distribution industry in the onshore and offshore wind, solar, rail, oil/gas, data centre, battery storage and utility sectors – this includes Joints, Terminations & Connectors to enable the installation of low, medium and high voltage power cables into underground trench or duct.
Key Product Categories: Connectors, Joints & Terminations MV HV | Cable Preparation & Jointing Tools | Duct Seals | Cable Transits | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Clothing & Protection | Cable Pulling | Earthing & Lightning Protection | Feeder Pillars
Main UK Stockists for: 3M Electrical, PFISTERER Connex, Nexans Power Cable Accessories (Euromold), Alroc, Ellis Patents, ABB, Roxtec, Cembre & CATU Electrical.