33kV Transition Cable Joint (XLPE PILC) Installed In HV Stepdown Substation
Published 12 Feb 2020
Image Courtesy of: Andrew Gebers – Electrician at Tshepang Electrical
Pictured:Â 33kV Transition Cable Joint (XLPE PILC) Installed In HV Stepdown Substation
Andrew focuses on electrical maintenance and breakdowns of mining machinery in his job role. Currently he concentrates on electrical maintenance of municipal systems and installations of municipal mini substations (both low and high voltage)Â and pole mounted transformers as well as repairs of consumer cables and overhead lines and street lights.
Thorne & Derrick
Specialist Electrical Distributor
Established since 1985, Thorne & Derrick International distribute the most extensive range of LV, MV & HV Cable Jointing, Terminating, Cable Pulling & Installation Equipment – contact us today for a competitive quotation.
Key Products : MV Joints & Terminations, Cable Cleats, Duct Seals, Cable Transits, Underground Cable Protection, Jointing Tools, Feeder Pillars, Cable Duct, Earthing & Lightning Protection, Electrical Safety, Cable Glands, Arc Flash Protection & Fusegear.
Distributors for : 3M, Pfisterer, Nexans Euromold, Elastimold, Catu, Roxtec, Emtelle, Centriforce, Lucy Zodion, Alroc, Hivotec, Cembre, Prysmian, Ellis Patents, ABB & Furse.
Jointers blog
Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.
Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.