Access Chambers for LV HV Power & Trackside Rail Cables | HS2 Case Study

Published 07 Sep 2020

Cubis access chambers for LV HV power and trackside rail cables

Access Chambers for LV HV Power & Trackside Rail Cables

Access Chambers for LV, HV and Trackside Rail Cables

HS2 Case Study – London Euston Station

The redevelopment plans for London Euston Station formed part of the wider High Speed 2 (HS2) rail programme. The project aimed to create a modern transport hub with new high-speed rail facilities.

As part of the original plans, Euston was one of four stations identified for major development. The proposals included improved passenger facilities, new platforms and upgraded surrounding public areas.

In addition, the project required extensive electrical infrastructure to support station operations and trackside services. Consequently, reliable cable access and protection were important considerations.

Cubis supported the project by providing a lightweight, modular access chamber solution for underground power cables.

HS2 Euston Station – Electrical Infrastructure Development

Network Rail and Skanska were involved in enabling works at Euston Station and the surrounding area on behalf of HS2. Meanwhile, Kilnbridge was appointed to undertake associated groundworks.

The original development plans included a 25,260m² terminus, new high-speed platforms and improvements to public spaces.

To support the proposed infrastructure, the project also involved constructing a new electrical substation. This would help distribute electrical power to the station and its associated facilities.

However, the restricted location presented several installation challenges. Limited access, storage space and movement around the site made conventional construction methods less practical.

Cubis STAKKAbox modular access chamber installation for underground electrical cables

Cubis Modular Access Chamber Range – STAKKAbox

Underground Cable Access Chambers for the HS2 Substation

The project included a new electrical substation near the main London Euston railway line. Its purpose was to distribute LV and HV power cables towards the station and trackside infrastructure.

As with many urban construction projects, the available working space was restricted. In addition, limited site access created challenges for transporting and handling construction materials.

Therefore, the project required an alternative to traditional concrete cable access chambers.

Challenges with Traditional Concrete Access Chambers

The installation required accessible cable draw pits for new electrical cables. Furthermore, the system needed to accommodate potential future cable installations.

However, conventional concrete chambers presented difficulties because of their weight and handling requirements.

For this reason, the project team approached Cubis for advice on its STAKKAbox modular access chamber range.

The lightweight design offered a practical alternative for the restricted site conditions. As a result, the project could use a modular chamber system rather than relying on traditional concrete construction.

Cubis STAKKAbox ULTIMA Connect GRP modular access chamber

Cubis STAKKAbox ULTIMA Connect Access Chamber

Cubis STAKKAbox ULTIMA Connect Access Chambers

Skanska worked with the Cubis technical team to select STAKKAbox ULTIMA Connect for the project.

The system was chosen for its lightweight construction and flexible installation capabilities. In particular, its modular design suited the limited working space at the substation.

Unlike traditional concrete chambers, ULTIMA Connect can be assembled on site without specialist wet trades. Consequently, installation can be completed using straightforward construction methods.

Lightweight GRP Chamber Construction

ULTIMA Connect uses individual 150mm-deep sections made from twin-wall glass-reinforced plastic (GRP).

These sections form a modular chamber that can be assembled to suit the required installation depth.

In the original project, individual components weighed less than 25kg. Therefore, the modular sections offered easier handling than traditional concrete alternatives.

Nevertheless, appropriate manual handling assessments remain necessary. Safe lifting arrangements depend on component dimensions, site conditions and the person undertaking the work.

Pre-Drilled Duct Entries and Faster Installation

The ULTIMA Connect chambers could be supplied with pre-drilled duct entries. As a result, less preparation was required during installation.

Once delivered to site, the chamber components could be assembled into the required arrangement.

Furthermore, the lightweight design reduced the need for heavy lifting equipment. This was particularly valuable within the restricted construction area.

Compared with conventional concrete chambers, the modular system helped shorten the installation process.

Integrated Access Chambers and Recessed Covers

The STAKKAbox ULTIMA Connect chambers were designed to work with Cubis B125 composite AX-S recessed access covers.

Together, the chamber and cover provided an integrated access solution for the electrical infrastructure.

The recessed covers also supported a suitable finish within the public space near the substation.

In addition, using compatible chamber and cover components simplified the overall installation arrangement.

Consequently, the project benefited from reduced installation time and fewer site handling challenges. The original case study also reported improved safety and overall cost savings.

Explore related recessed access covers for underground cable infrastructure.

Cubis access chamber step-by-step installation guide

Access Chamber Step-by-Step Installation Guide

Cubis Access Chambers – Installation Benefits

Cubis STAKKAbox access chambers provide a modular alternative to conventional concrete chamber construction.

Depending on the design and site conditions, complete chamber installations can take less than one hour.

As a result, contractors may reduce installation time, labour requirements and associated costs.

Why Choose Modular Access Chambers?

The STAKKAbox range offers several advantages for underground cable installations:

  • Lightweight construction: Modular components are easier to transport and handle than traditional concrete chambers.
  • Rapid assembly: Chamber sections can be assembled on site using standard installation methods.
  • Flexible configurations: Modular designs accommodate different chamber sizes and depths.
  • Reduced plant requirements: Suitable installations may not require heavy lifting equipment.
  • Adaptable installation: Chamber components can be modified to suit certain site conditions.
  • Existing infrastructure: Modular designs can help contractors build chambers around established cable networks.
  • Reduced construction time: Faster installation can support project schedules and reduce disruption.

Furthermore, chamber designs can accommodate different cable duct arrangements.

For this reason, modular access chambers are suitable for many rail, utility and electrical infrastructure projects.

Access Chambers for Existing Cable Networks

Modular access chambers can also support projects involving existing underground electrical services.

For example, installers may need to construct a chamber around cables or ducts already in place.

In these situations, adaptable chamber sections can offer greater installation flexibility.

However, the finished arrangement must still meet the required structural and loading specifications.

Therefore, chamber selection should consider the installation location, required access and suitable cover rating.

Cubis access chambers access covers and cable protection systems

Cubis | Access Chambers, Access Covers, Cable Protection & Cable Accessories

Access Chambers for Rail and Electrical Infrastructure

Underground cable access chambers provide access to power cables, ducts and associated electrical infrastructure.

They are commonly used across rail networks, substations, utility installations and commercial developments.

In addition, access chambers can support future cable installation and maintenance work.

For example, chambers may be positioned along underground cable routes where cables need to be pulled, inspected or accessed.

Consequently, correct chamber selection is important for both initial construction and long-term network operation.

Supporting LV, MV and HV Cable Installations

Access chambers can form part of infrastructure carrying LV, MV and HV power cables.

However, the chamber dimensions and construction must suit the specific installation requirements.

Design considerations include duct positions, cable routing, installation depth and access cover loading.

Furthermore, contractors should consider future maintenance and cable replacement requirements.

By selecting a suitable system, project teams can provide accessible underground infrastructure while supporting efficient cable installation.


Thorne & Derrick – LV, MV and HV Electrical Equipment

Thorne and Derrick specialist distributors of LV MV HV cable and electrical equipment

LV, MV & HV Jointing, Earthing, Substation & Electrical Equipment

Thorne & Derrick International are specialist distributors of LV, MV and HV cable installation and electrical equipment.

Our range includes cable jointing, duct sealing, substation equipment and accessories for underground electrical infrastructure.

In addition, we supply products for overhead line construction and electrical maintenance.

We support UK and international companies working with LV, 11kV, 33kV and EHV power systems.

Consequently, customers can source specialist equipment for cable installation, jointing and electrical network maintenance.

Explore Our Product Categories

Thorne & Derrick supply products for underground cable installation, power distribution and electrical safety.

For technical advice, product information or availability, contact Thorne & Derrick to discuss your electrical infrastructure requirements.