Extraordinary Fibre Earth Wire Pull
Published 26 Mar 2021
Image courtesy of: Paul Everett MIET – Owner/Operator at UNS Limited.
Pictured: Extraordinary Fibre Earth Wire Pull
“Fibre earth wire pull completed today in Suffolk over 11 tower spans.”
Terminal tower in 132kV compound. Crossing over 2 x dual carriageways, 1 x 25kV electrified railway, 1 x 33kV overhead line, 3 x 11kV overhead lines, 1 x minor road.”
Included 1 x catenary system launch and 10 scaffold sides with 3 nets. “1 portable generation set connection, 1 x 11kV outage to create network mods and a further 11kV outage on day.” Paul Everett.
LOW, MEDIUM & HIGH VOLTAGE CABLES
LV MV HV PULLING & JOINTING EQUIPMENT
T&D supply UK and international contractors responsible for Low & High Voltage Power Cabling, Pulling, Jointing & Civil Engineering with cable duct, duct seals, lubricant, cable covers and tape tiles specified for 11kV/33kV installations.
PRODUCT OVERVIEW
Cable Rollers | Cable Socks |
Cable Drum Jacks | Cable Drum Trailers |
Cable Winches | Conduit Rods |
Cable Lubricants | Cable Blowing Equipment |
Cable Protection – Tapetile 11kV | Stokbord 33kV | Cable Duct – Power, Fibre, Telecoms |
Joints, Terminations & Connectors MV HV | Cable Duct Seals |
Cables MV HV 11kV 33kV | Cable Jointing Tools |
Further Reading
11kV Cable Pulling – What Is The Maximum Distance For Ease of HV Cable Pulling Between Manholes
MULETAPE CALCULATOR | How To Select The Right Cable Pulling Tape For The Job
Cable Pulling For Alith Project 110kV XLPE Power Cable
Jointers blog
Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.
Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.