Cold Shrink Joints From 3M Electrical – MV HV Ranges
February 1st, 2022
Cold Shrink Cable Joints By 3M
MV HV Cold Shrink Joints
Stocked & Supplied by Thorne & Derrick | Technical Support | Competitive Prices | UK & International Projects
Thorne & Derrick distribute 3M Cold Shrink Cable Joints suitable for jointing, connecting and splicing medium and high voltage (MV-HV) cables including 11kV, 33kV, 66kV and 132kV – we provide competitive prices for cold shrink cable joints from extensive stocks to UK and international destinations.
3M Cold Shrink Cable Joints include built in components to ensure sound insulation, stress control and adequate earth potential over the screens of medium voltage cables. The 3M Cold Shrink Technology ensures constant radial pressure is exerted over the cable for the duration of the cable joint’s life.
The Simple Application Of A 3M Cold Shrink Cable Joint
![]() |
![]() |
![]() |
![]() |
| 1. Place the 3M Cold Shrink splice body onto the prepared cable, connect the cores and clean cables thoroughly. | 2. Thoroughly grease the connected cable in preparation for the cable splice body. | 3. Once in position, begin to remove the inner coil from the cable joint body. | 4. For extra peace of mind, take advantage of the fact that cable splice body position is easily checked. |
![]() |
![]() |
![]() |
![]() |
| 5. Place the earth stocking over the splice body. Ground and secure with 3M Constant Force Springs. | 6. Insulate the constant force springs with Scotch 23 Rubber Splicing Tape and then overlay with Scotch Rubber Mastic Tape 2228. | 7. Position the pre-parked 3M Cold Shrink Outer Protection Tube over the stocking and beginning to remove the inner supporting core. | 8. Continue to remove the inner core until the outer tube is fully shrink, completing the cable joint. |
3M Cold Shrink cable joints are available in a Standard cost-effective range or Premium options for medium/high voltage (MV HV) power systems.
The Standard range covers many of the most common cable configurations and size ranges unique to the UK market but requires the electrode to be built up by the cable jointer using Scotch 13 electrical semi-conductive tape.
3M Standard Cold Shrink Cable Joints
The Standard 3M Cold Shrink Cable Joints are available for both single core and 3 core cable connections for medium/high voltage cables including 11kV 33kV 66kV and 132kV.
3M premium Cold Shrink Cable Joints
The Premium 3M Cold Shrink Cable Joints are available for both single and 3 core cable connection for medium/high voltage cables including 11kV 33kV 66kV and 132kV.
3M Super Premium Cold Shrink Cable Joints
The Super Premium 3M Cold Shrink Cable Joints are available for both single and 3 core cable connections or medium/high voltage cables including 11kV 33kV 66kV and 132kV.
Cold Shrink Joints Features
- Prefabricated one-piece Cold Shrink splice body with integrated semi‑conductive electrode forms a faraday cage over the connector and eliminates the use of tapes or additional moulded or metallic electrodes
- Fast and easy installation at temperatures ranging from -20°C to +50°C
- Suitable for a broad range of cable type and sizes
- Permanent radial contact pressure
- Simple assembly by pulling out the spiral core
- Meets exceeds the requirements of European Standard CENELEC HD 629.1 and IEC 60502-4
| QS1000 | QS2000 | QSIII | QS200 | |
| Splice Body Type | Moulded | Moulded | Moulded | Extruded |
| Range Coverage | 50sqmm to 400sqmm | 50sqmm to 400sqmm | 300sqmm to 630sqmm | 50sqmm to 1000sqm |
| Voltage Class | 6.6/11(12)kV | 20/22(24)kV to 19/33(36)kV | 19/33(36)kV | 6.6/11(12)kV to 19/33(36)kV |
| 100% Factory Tested Splice Body | Yes | Yes | Yes | No |
More from 3M Electrical
- Continuous Shearhead Bolt vs. Crimp Compression Technologies By 3M Electrical
- 3M Electrical Tapes Guide | The Tape For Every Task
- 3M Terminations | Surface Tracking on Medium Voltage Cable Terminations by 3M
- 66kV Terminations | NEW Stock Introduction for 3M Cold Shrink Cable Terminations
- Stress Control | MV Cable Terminations by 3M Electrical
- Q/ Can 3M Electrical Offer MV Cable Joints For Hazardous Areas?
- MV Cable Jointing & Some Jointers Tips Using 3M Scotch Tapes


Supplying Cable Termination, Jointing, Pull-in & Electrical Equipment up to 66kV
Thorne & Derrick distribute the most extensive range of MV HV Medium & High Voltage Cable Joints, Terminations & Connectors from manufacturers including 3M, Prysmian, Nexans Euromold, Elastimold, Pfisterer CONNEX and Shrink Polymer Systems.
Heat shrink, cold shrink, push-on and slip-over cable accessories enable the jointing, terminating and connection of 11kV-33kV and 66kV-132kV cables to oil, air or gas insulated switchgear, transformers, motors and overhead lines distributing electricity at MV HV.

MV HV High Voltage Cable Joints | Cable Terminations | Cable Connectors | Distributed from Stock | UK & Export Sales
Nexans Supply Cables For The World’s First Floating Wind Farm
February 1st, 2022
Hywind Scotland Pilot Park Offshore Wind Farm
Offshore Export Cables
Hywind Scotland Pilot Park Offshore Wind Farm
Location: Scotland
Partnership: Equinor
Market: Wind Farms-Offshore
Equinor (former Statoil) awarded Nexans the contract to supply static and dynamic cabling and associated accessories for the world’s first floating wind farm, following a successful demo facilitated by Nexans’ cables which have been in operation since 2009.
Following the initial Norway demo, Equinor awarded Nexans a new contract worth approximately 10.2 million Euro to service the Hywind Scotland Pilot Park wind farm. Nexans delivered offshore export cables to the site, located 30 km off the coast of Aberdeenshire.

The offshore cable systems was tested, sealed off, prepared for pull-in and delivered in individual lengths ready for installation. The cables were tested and manufactured at Nexans’ specialized facility in Halden, Norway.
The pilot 30MW floating farm is made up of five wind turbine generators connected through an inter-array cable network before feeding into a single offshore export cables carrying energy back to land in Peterhead, Scotland. Following the successful Norway demo, the project, assisted by Nexans, will demonstrate technological improvements, installation and operation of multiple floating wind turbines, as well as examine the cost efficiency of the park configuration.

Hywind Project – Copyright STATOIL – Wind Farms Offshore
The Hywind project will generate energy to power roughly 20,000 homes, and will lead the way to developing larger floating wind farms in other areas after an initial two-year testing period.
Vincent Desale, Nexans SEVP for the Subsea and Land System Business Group commented “ This project is a great example of Nexans pioneering alternative offshore wind design, extending the options for renewable energy generation. The contract establishes Nexans as leaders in offshore wind innovation by designing specialist cables for both the initial pilot project and the Hywind Pilot Park. ”

Hywind Project – Floating Farm – Copyright Statoil

FURTHER READING
- Nexans Offshore & Onshore Export Cables | Seagreen The Largest Windfarm Project In Scotland
- Onshore Wind Farms: Nexans Awarded Underground Power Cable Contract for Viking Wind Farm
- Nexans Windlink® Cables To Electrify The Future Of Onshore Wind Turbines
- Nexans OJC Offshore Medium Voltage Junction Cabinets For Wind Power Projects
- Nexans Power Cable Accessories For Wind Energy Projects – MV & HV Cables




See how T&D support, supply and service the Renewable Energy industry.
Specialist Distributors to the UK and international Offshore Wind & Renewable industry to provide safe and reliable LV HV Electrical Cable & Power Distribution Systems up to 66kV – we are highly customer responsive and absolutely committed to providing a world-class service. Contact our UK Power Team for competitive quotations, fast delivery from stock and technical support or training on all LV-HV products.
Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV
Nexans Offshore & Onshore Export Cables | Seagreen The Largest Windfarm Project In Scotland
January 31st, 2022
Nexans Power Export Cable Supplier For The Seagreen Offshore Wind Farm Project
Offshore & Onshore Power Export Cables
Seagreen Offshore Wind Farm Project
Location: Scotland
Partnership: SSE Renewables
Market: Wind Farms-Offshore
Nexans is SSE’s preferred supplier for the design, manufacture and installation of the onshore and offshore export cables for the 1,075MW Seagreen wind farm project. Nexans will supply and install three 65 km offshore export cables and three 20 km onshore export cables.

About the project
Phase 1 development, comprising the Seagreen Alpha and Bravo wind farms. It will have combined capacity of 1,075MW. When complete it will form the largest windfarm project in Scotland when they come online in 2024. To promote contract opportunities for local companies, SSE Renewables organises ‘Meet the Buyer’ events, where they can discuss their service offerings with members of the supply chain.
Seagreen Project Director John Hill said: “We are pleased to announce Nexans as our preferred supplier to design, supply and install the onshore and offshore export cable. Nexans is one world leaders in this field and this agreement is a major step forward for the Seagreen project.”

Seagreen Offshore Wind Farm project
The Seagreen Offshore Wind Farm project is located 27km off the coast of Angus in the North Sea.
A joint venture between TotalEnergies (51%) and SSE Renewables (49%), Seagreen will be Scotland’s largest and the world’s deepest offshore wind farm when complete.
The Seagreen offshore wind farm was consented with permission granted to install 150 offshore wind turbines.
114 offshore wind turbines are currently under construction with an installed capacity of 1,075MW and will be fully operational by early 2023. The power generated will be exported to the grid via a new substation at Tealing near Dundee.
The 114 Seagreen wind turbines will provide enough green energy to power more than 1.6 million homes, equivalent to two-thirds of all Scottish homes. They will also displace over 2 million tonnes of carbon dioxide from electricity generated by fossil fuels every year – similar to removing more than a third of all of Scotland’s annual car emissions and making a significant contribution to Scotland’s net-zero ambition by 2045*.
The remaining 36 offshore wind turbines are consented but not yet constructed. The power will be exported to the grid via Cockenzie, East Lothian.
In January 2022 Seagreen submitted a Screening Report to Marine Scotland to increase the size of the 36 consented turbines.

FURTHER READING
- Onshore Wind Farms: Nexans Awarded Underground Power Cable Contract for Viking Wind Farm
- Nexans Windlink® Cables To Electrify The Future Of Onshore Wind Turbines
- Nexans OJC Offshore Medium Voltage Junction Cabinets For Wind Power Projects
- Nexans Power Cable Accessories For Wind Energy Projects – MV & HV Cables




See how T&D support, supply and service the Renewable Energy industry.
Specialist Distributors to the UK and international Offshore Wind & Renewable industry to provide safe and reliable LV HV Electrical Cable & Power Distribution Systems up to 66kV – we are highly customer responsive and absolutely committed to providing a world-class service. Contact our UK Power Team for competitive quotations, fast delivery from stock and technical support or training on all LV-HV products.
Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV
5 Ways You Can Reduce The Risk Of Arc Flash
January 25th, 2022
Arc Flash Risk
Arc Flash Risks
-
Special thanks to Engineering Power Solutions for the kind permission to republish
Arc flashes pose a significant hazard to electrical systems operatives. They can cause damage to equipment as well as severe injury or even death to personnel. However, with proper arc flash safety procedures in place it is possible to reduce the risk significantly.
What Is An Arc Flash?
An arc flash is a sudden discharge of energy, connecting a component through the air to the ground or to another voltage phase in the same system. This can be the result of loose connections, exposed live parts or other short circuits in faulty equipment. Careless work practices can also cause arc flashes when working on live electrical systems.
The resulting explosions produce highly dangerous intensities of heat and light.
As well as damage to electrical equipment, arc flashes can cause internal and external burns, eye injuries from intense UV light emissions, and lung damage from hot gasses or vaporised metals.
How To Avoid An Arc Flash
Given these hazards, it would seem vital to know how to prevent arc flashes. Yet aside from simply powering down a system, it is virtually impossible to eliminate the hazards entirely. However, it is possible to mitigate the risks, and what’s more, it is an employer’s legal duty to carry out appropriate assessments to do so.
Here are five ways to minimise the dangers posed by arc flashes.

1) Power Down Electrical Equipment Where Possible
An arc flash can only occur with live voltage, so the simplest hazard mitigation strategy is to power down the system when not in use. It should always be assumed that a system is live until it has been verified as de-energised. However, it is not always possible to carry out work on de-energised electrical equipment, and in these cases, other safety measures must be taken.
2) Ensure Safe Working Systems
A full arc flash risk assessment should be carried out on all electrical systems. It need only be conducted once in full but should be reviewed at least every five years. Reviews should also be carried out if any components are changed or other system updates are made. A professional risk assessment identifies the potential hazards in an electrical system, so that they may be properly labelled, and the risks mitigated.
3) Wear PPE
When engaging with electrical systems, workers should wear the appropriate personal protective equipment (PPE). Insulated rubberised gloves give protection against electrical arcs, as well as heat and flame resistance. Head and face gear is also important to protect against high heat and light intensities, as well as impact damage from an arc flash explosion.
4) Keep a Safe Distance
Arc flashes can cause injuries at distances of up to six metres. Operators should maintain a safe distance from points of severe hazard, using remote tools or robots, as well as wearing appropriate PPE when within the calculated arc flash boundary.
5) Ensure Proper Training
Anybody working with electrical systems needs the appropriate training to understand the hazards and the requirements for safe working. This is even more important if engagement with live systems is unavoidable. Operatives need to know how to conduct a risk assessment before starting work, identifying hazardous points in the system and the appropriate working practices to mitigate them.
What Next?
Speak to us today to find out more about arc flash risk mitigation, and how you can improve electrical health and safety in your workplace.

Engineering Power Solutions is a trustworthy engineering team offering personal, friendly and transparent technical services whilst continually improving engineering design efficiency. We also provide product procurement solutions, combined with our engineers technical expertise we will help you with product selection, advice and ongoing technical support throughout your project.
Arc Flash Clothing Stockists & Suppliers
This is the question arc flash specialist protective clothing manufacturer, ProGARM, is asking the UK industry. The question has been posed as part of a national campaign to raise awareness around the often-fatal risk of arc flash injury.
The campaign sees ProGARM calling on workers at all levels within the rail, construction, petrochemical, utilities, power generation and industrial electrical industry to share their experiences in a bid to capture a true picture of the real risk of arc flash across the UK.


Arc Flash | Polo Shirts | | Coveralls | | Sweatshirts | Helmets | Insulating Gloves
Substation Earthing for Low, Medium & High Voltage Systems | CPD Training By EA Technology
January 25th, 2022
Substation Earthing for Low, Medium & High Voltage Systems
Substation Earthing
EA Technology – CPD Training
Cost: £1220
Course Duration: 3 Days
Course Location: Capenhurst, Chester
Dates: 17th-19th May 2022
CPD Information: 18 Hours
Sign Up Here to attend the CPD Training: https://eatechnology.com/training/scheduled-courses/substation-courses/substation-earthing/
Day one
Introduction and Principles of Earthing in LV, MV and HV Systems
- Role, principles and importance of earthing
- Preventing electric shock in LV systems
- Earth faults, fault voltages, EPR and voltage gradient in MV and HV systems
- Impedance in earthing and bonding conductors
- Important criteria for earthing assessment
LV Earth Systems and Earth Terminals
- Earthing requirements for public LV systems
- Earth terminals for supply points in public and private LV cable systems
- Abnormal voltages on LV earth terminals
- Requirement to separate HV and LV earth systems
- Special LV earthing situations
Earth Fault Current and EPR Analysis
- System earthing
- Redial and non-radial systems
- Simplified and rigorous fault current analysis
- Data and accuracy for project and EPR assessments
Introduction to Earth Standards and Company Earthing Policies
- The need for standards and company procedures
- The voltages and environmental impact that occur during earth fault at a substation
- Description of safety voltages, limit values and ways they are constrained
- Developments in ENA S34 and 14-24
Introduction to Earthing Design
- Earthing standards; how this guides design practice
- Main design criteria
- Introduction to earth resistance formulae
- Comparison of ways to reduce the earth resistance
Day two
Design of Substation Earthing
- Stages in the design of a LV distribution substation
- Use of standard formulae to investigate design options and check compliance
- Design of the local substation electrode system
- Design of the earthing system for a HV substation
- Exercise in developing the outline electrode design
Measurement Theory
- Earth resistivity
- Earth resistance
Practical Measurement Exercise
- Group exercise undertaking soil resistivity and electrode resistance measurements
Analysis of Measurement Data
- Delegates will use specialist software to gain a derived soil model for design purposes
- Analysis of electrode resistance data to calculate the true resistance of the measured earthing system
Day three
Industrial Site Measurement Case Study
- Undertaking measurements in difficult locations
- Highlight the important issues
- Explanation of procedures
Analysis of Earth Fault Current and EPR in more Complex Network Arrangements
- Network calculation procedures
- Mixed underground and overhead systems and isolated cable sections in overhead lines
- Identifying points of worst case EPR
Example Case Studies and Calculations of EPR and risk effects in Industrial, generation and public HV and MV Systems
- Generation and industrial sites connected to cable and overhead line systems
- Separation of HV/MV and LV earth systems in high resistivity areas
- LV installations in vicinity of HV equipment with high EPR
Course Review
Programme may be subject to amendment.
Why Should I Attend?
- Enhance your knowledge of earthing principles and systems
- Understand the legal and environmental framework and standards that apply to earthing systems
- Develop your ability to specify earthing system design to current standards
- Reduce the risk of critical system failure through enhanced design
- Enhance your understanding of the role of earthing systems in safe working practices
- Enhance your understanding of earthing measurement processes and the analysis of measurement data
- Develop knowledge of managing earthing system design and maintenance projects
This course is delivered by leading specialists in earthing assessment, design and audit and draws on their extensive expertise in the field.
Testimonials
‟Fascinating course due to the extensive knowledge of the presenter. Lots of myths debunked!! Enough knowledge attained to be able to challenge consultant designers and know the right questions to ask. Undoubtedly a good investment in time.”
Ade
15-17 June 2021
‟Definitely improved my technical knowledge of more up to date modern thinking & the standards used within the UK. Very informative, even though the formulas slightly taxing as I am 35 years since being in any educational, academic faculty. Presenters were very good & very approachable. Thanks.”
Paul
15-17 June 2021
‟Extremely informative, well presented and well organised. Thank you. ”
Tom
15-17 June 2021
‟Extremely informative.”
Jim
15-17 June 2021
‟Good course, expanded my knowledge considerably.”
Michael
15-17 June 2021
EA Technology

EA Technology are a global provider of end to end power engineering solutions and provide expert consultancy, innovative instruments, skills training, technical services and more.

William G. Higinbotham has been president of EA Technology LLC since 2013. His responsibilities involve general management of the company, including EA Technology activities in North and South America. William is also responsible for sales, service, support, and training on partial discharge instruments and condition-based asset management. He is the author or co-author of several industry papers.

Supplying Cable Termination, Jointing, Pull-in & Electrical Equipment up to 66kV
Thorne & Derrick distribute the most extensive range of MV HV Medium & High Voltage Cable Joints, Terminations & Connectors from manufacturers including 3M, Prysmian, Nexans Euromold, Elastimold, Pfisterer CONNEX and Shrink Polymer Systems.
Heat shrink, cold shrink, push-on and slip-over cable accessories enable the jointing, terminating and connection of 11kV-33kV and 66kV-132kV cables to oil, air or gas insulated switchgear, transformers, motors and overhead lines distributing electricity at MV HV.