Blog

Top Benefits of High-Voltage Direct Current (HVDC) Transmission

May 11th, 2021
Top Benefits of High-Voltage Direct Current (HVDC) Transmission

A Benchmark Brief

from Burns & McDonnell

by 
Peter is a project manager at Burns & McDonnell with 30 years of experience in HVDC and flexible AC transmission systems and specializes in HVDC system studies, HVDC control and protection, reactive power compensation, power system expansion/interconnection studies and simulation, and power system computer-aided design (PSCAD) model development and studies.

Burns & McDonnell are a family of companies with an unmatched team of 7,600 engineers, construction professionals, architects, technologists and scientists. Their singular mission since 1898 has been to make clients successful – ‘When we plan, design, permit, construct and manage projects worldwide, we do it like we own it.’

Burns & McDonnell is a 100% employee-owned company who tackle every technical challenge, every complex detail, with the intent and attention of an owner. It’s what brings clients back, project after project.

Benefits of HVDC Transmission

As the demand for power is increasing, government policies are providing incentives to utilities for adopting renewable energy sources. Utilities are investing time and money to improve the transmission of renewables from offshore wind and solar.

Today, most power grids use high-voltage alternating current (HVAC) for transporting energy over long distances, but that technology is susceptible to losses during transmission, has limits on power transfer over long distances, and has limited power control capability. A high-voltage direct current (HVDC) system converts the power from alternating current (AC) to direct current (DC) at the sending end, transmits the power using DC, converts the power back from DC to AC at the receiving end, and delivers the power to the receiving end AC grid.

Application of HVDC technology is expanding not only for large bulk power transfer over long distances, but also in the interconnection of renewable energy sources.

Bulk Power Transmission Efficiencies

Transmission cost depends on numerous factors, such as the size and quantity of conductors, equipment needed at the terminal stations, and transmission tower size.

HVDC is particularly well suited for bulk power transmission over long distances for several reasons:

  • A bipolar HVDC system consisting of two high-voltage conductors on one tower offers reliability comparable to a double-circuit HVAC line, significantly reducing the transmission line costs and right-of-way requirements.
  • Losses in a transmission line depend on the resistance of the line. One factor that impacts the resistance is skin effect, which causes the effective resistance to increase with increasing AC frequency. Use of DC eliminates the skin effect, reducing overall transmission losses.

HVDC transmission systems require converter stations at each end of the line to convert the AC to DC and back. Cost of HVDC converter stations can be substantially more than a conventional AC substation with similar power throughput. That expense may be counterbalanced by reduced transmission line costs and reduced losses. This becomes more evident as the distance and/or power transfer level increases.

Cable Length Advantage

HVAC transmission cable length is limited because as the length of cable increases, the capacitive charging current increases. It can reach a point that the capacitive charging current approaches the total current carrying capacity of the cable. HVDC has no capacitive charging current, and higher levels of power can be delivered over longer distances. HVDC cable length is theoretically only limited by capital cost. Enabled applications include:

  • Connection of offshore wind farms: As development of offshore wind generation assets increases, the location of wind turbines generators is moving farther from the shore. The increasing distances between the generators and the onshore point of interconnection means the necessary cable length is increasing. HVDC can be a viable transmission option, unlocking the true potential of renewable energy.
  • Transmission into congested areas: Increasing demand, particularly in congested areas, coupled with challenges of accessing rights-of-way has driven the need to maximize power transfer and a push to go underground. HVDC is an excellent option for high-power cable transmission installations, maximizing the amount of power transfer per cable.

Power Controllability

Within an HVAC system, the ability to control power flows in any given parallel path is limited. Power flows are dictated by the relative impedance of various parallel paths from a given source of generation to a given load. HVDC, on the other hand, offers very fast and accurate control of the power flowing within its system. The operator can select the amount of power to be transmitted over the link. If that power is available at the sending end, it is then converted to DC, transmitted to the receiving end, converted back to AC and injected into the receiving AC system. Auxiliary control functions can further enhance AC system’s stability by providing frequency control and damping of power swings within the AC grid.

HVDC systems offer higher transmission capability and lower transmission losses over long distances than AC and provide better ability to control power flows. Additionally, they provide the ability to transmit more power over longer lengths of cables, making them an attractive alternative for the transition to renewable energy sources.


LV MV HV Cable Installation, Jointing, Substation & Electrical Equipment

T&D | LV MV HV Cable Installation, Jointing, Substation & Electrical Equipment

Thorne & Derrick

T&D are Specialist Distributors to UK Distribution Network Operators (DNO’s), NERS Registered Service Providers, ICP’s and HV Jointing Contractors of an extensive range of LV, MV & HV Jointing, Earthing, Substation & Electrical Eqpt – this includes 11kV/33kV/66kV cable joints, terminations and connectors for both DNO and private network applications.

Contact our UK Power Team for competitive quotations, fast delivery from stock and technical support or training on all LV-HV products.

All international sales enquiries can be serviced and supplied by our Export Power Team.

Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV HV 

Thorne & Derrick International

Cable Pulling & Laying | Technical Library

May 6th, 2021

Cable Pulling Laying Equipment


Technical Library & Resources | Education & Learning with SEB International 

Thorne & Derrick provide competitive prices and fast delivery as the main UK distributor of SEB Cable Pulling & Laying Products including handling and installation equipment for power (land and subsea), umbilicals, fibre and telecoms cables. SEB products are typically used to install transmission, distribution and medium/high voltage substation power cables into ducts or trenches, LV up to 400kV.

Thorne & Derrick International distribute the most extensive range of Cable Pulling & Laying Equipment to enable the installation of  LV, MV HV Cables into underground trench or duct – products are also stocked for fibre optic blowing, OHL stringing, subsea trenching, offshore umbilical installations and pulling armoured cables onto cable tray.

Cable Pulling Laying Equipment


Cable Pulling & Laying

TOP 20 BLOGS

See our collection of the Top 20 Cable Laying Blogs featuring SEB International, and their range of LV, MV & HV Cable Pulling and Cable Laying products:

  1. Cable Laying & Pulling – Installing LV-HV Cables Into Trench
  2. Cable Laying & Pulling – Installing LV-HV Cables Into Duct
  3. How Do Cable Socks React To Salt Water?
  4. Cable Pull Calculations – Installing & Pulling Heavy Cables
  5. Duct Rod Pushers | Installing Cables Into Conduits
  6. Cable Laying, Installation & Support Products | Offshore Oil & Gas Cables
  7. MV HV Cable Laying, Installation & Support Products | Offshore Windfarms
  8. Cable Pulling | Safe Pulling of Cables Using Manual Laying
  9. Lace Up Cable Socks – A Guide For Users When Pulling Cables
  10. Cable Socks – Technical Guide for Safe Cable Pulling Using Cable Socks
  11. What Is The Maximum Distance For Ease of HV Cable Pulling Between Manholes
  12. Cable Pulling Equipment – A Cable Duct Laying Guide From BT Openreach
  13. Stokbord®Drum | 33kV Cable Protection for Underground Medium Voltage Cables
  14. Stokbord Drum | Protection of High Voltage Electricity Cables
  15. Which Access Chamber Can Be Built Faster?
  16. Cable Winch | Customised & Refurbished 5 Tonne Cable Pulling Winch
  17. Cable Pulling | Safe Pulling of Cables Using Motorised Pullers
  18. Cable Laying | The Importance of Cable Installation Instructions
  19. Cable Drums | Recommended Transport & Storage
  20. How to Prepare Cables To Avoid Cable Damages & Faults

Further Reading | Cable Drum Handling & Laying Cables | A Guide from Nexans

Cable Pulling & Laying | Technical Library

Cable Pulling & Laying | Technical Library

T&D distribute the complete range of LV-HV Cable Pulling and Laying Equipment including cable rollers, cable socks, drum jacks, drum trailers, cable lubricant, underground cable protection and conduit duct rod.


Cable Pulling & Laying | Technical Library


THORNE & DERRICK are Specialist Distributors of LV HV Cable Jointing, Earthing, Substation & Electrical Eqpt up to 66kV – this includes the most extensive range of Ex Stock Innovation Tooling to facilitate safe and reliable preparation, termination and installation of cables.

 

HV Cable Tools

Cable Innovation Tools & Accessories for Low & High Voltage Power Systems

MV HV High Voltage Cable Joints | Cable Terminations | Cable Connectors | Distributed from Stock | UK & Export Sales

MV HV High Voltage Cable Joints | Cable Terminations | Cable Connectors | Distributed from Stock | UK & Export Sales

 

Jointing 44kV High Voltage Submarine Cables Using 3M Cold Shrink Splices

May 6th, 2021

Images Courtesy of: Douglas Page (Instructor & Cable Splicer at Hydro One Training and Development Services).

HV Cable Splicers: Douglas Page & Jeff Silliphant.

Application: 3M 44kV Cold Shrink Submarine Cable Joint (Single Core 250 MCM).

Location: Lake Couchiching, Ontario. Canada.3M Electrical

Please note aspects of the installation were unable to be photographed as 4 hands were required simultaneously to be cable jointing and no stand-in photographer was available.

Let’s start Cable Jointing….

1. The cable splicing barge comes alongside the buoy marker for a previously installed cable and pulls it up onto the barge, secures it, and anchors all four corners of the barge.1. The cable splicing barge comes alongside the buoy marker for a previously installed cable and pulls it up onto the barge, secures it, and anchors all four corners of the barge.

2. The “reel” barge backs up and connects to the cable splicing barge and anchors all four corners, the cable is pulled to the cable splice point and secured.2. The “reel” barge backs up and connects to the cable splicing barge and anchors all four corners, the cable is pulled to the cable splice point and secured.

3. Both 44kV cables are prepared to manufacturers specifications, in this case they were prepared using Speedy Systems high voltage cable preparation tools not hand tools.3. Both 44kV cables are prepared to manufacturers specifications, in this case they were prepared using Speedy Systems high voltage cable preparation tools not hand tools.

4. All of the 3M Cold Shrink Cable Termination kit parts are slid on the appropriate sides and the cable is crimped together.4. All of the 3M Cold Shrink Cable Termination kit parts are slid on the appropriate sides and the cable is crimped together.

5. 3M supplied silicon grease is applied by the HV cable splicers – we believe it was changed to colour red to determine if it was actually used in the event of a future cable splice failure.5. 3M supplied silicon grease is applied by the HV cable splicers - we believe it was changed to colour red to determine if it was actually used in the event of a future cable splice failure.

6. Inner 3M Cold Shrink cable splice body is cold shrink installed without the requirement for a heat source associated with the jointing of cables using heat shrink cable terminations. Aligned with marker tapes previously installed, then the concentric neutrals are brought back across the cable splice.6. Inner 3M Cold Shrink cable splice body is cold shrink installed without the requirement for a heat source associated with the jointing of cables using heat shrink cable terminations. Aligned with marker tapes previously installed, then the concentric neutrals are brought back across the cable splice.

7. In this situation the high voltage splicing design was to have the neutrals individually crimped to each other, a soft mastic bed is made for the crimp sleeves to lie in to prevent damage to the insulation shield.7. In this situation the high voltage splicing design was to have the neutrals individually crimped to each other, a soft mastic bed is made for the crimp sleeves to lie in to prevent damage to the insulation shield.

8. After the neutrals are all crimped and the shaped into their final position for the cable splice.8. After the neutrals are all crimped and the shaped into their final position for the cable splice.

9. Once shaped they are evenly spread out and held in place to prevent hang up points for installation of the outer jacket 3M Cold Shrink tube.9. Once shaped they are evenly spread out and held in place to prevent hang up points for installation of the outer jacket 3M Cold Shrink tube.

10. Very important, the cable jacket is abraded, then two rows of multiple layers of aqua-seal mastic is installed, then the outer jacket is cold shrunk on.10. Very important, the cable jacket is abraded, then two rows of multiple layers of aqua-seal mastic is installed, then the outer jacket is cold shrunk on.

11. To enhance the water-blocking ability of the cable joint the HV cable splicer applies extra wraps of 3M mastic tape.

11. To enhance the water-blocking ability of the cable joint the HV cable splicer applies extra wraps of 3M mastic tape.

12. After the outer jacket is installed and sealed using mastic and tape then the submarine armour is wrapped back around the high voltage cable .12. After the outer jacket is installed and sealed using mastic and tape then the submarine armour is wrapped back around the high voltage cable .

13. The submarine cable armour wires are then individually crimped together using Burndy crimping tools and then wrapped in mastic and tape.13. The submarine cable armour wires are then individually crimped together using Burndy crimping tools and then wrapped in mastic and tape.

14. The entire 3M Cold Shrink cable splice is covered in three layers of 3M Armorcast, (installed wet and sets solid). Then all anchors are pulled, the barges stay attached and the cable barge travels the route, paying off the cable to the end of the reel.14. The entire 3M Cold Shrink cable splice is covered in three layers of 3M Armorcast, (installed wet and sets solid). Then all anchors are pulled, the barges stay attached and the cable barge travels the route, paying off the cable to the end of the reel.

Jointers blog

Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

15,000+ Subscribers. ➡ Joints Terminations Cleats Lugs MV HV 11kV 33kV

110kV Cable With Stainless Steel Sheath Plumbed/Wiped To Copper Sheath Cable

May 6th, 2021

Image Courtesy of: Andy O’Malley (IBEW 258 EHV Cable Jointer/Splicer).

“This is a stainless steel super sheathed 110kV cable in Brisbane Australia – the high voltage cable had an HDPE graphite coated outer sheath then a stainless steel sheath.”

“A PVC sheath was below the stainless steel then below that a copper sheath. Finally, inside the sheath layers was a 1600sqmm copper conducted XLPE cable.”

“Great project with the Energex boys,” comments Andy.

110kV Cable With Stainless Steel Sheath Plumbed/Wiped To Copper Sheath Cable

 

Further Reading

Confined Spaces Cable Jointing Using 3M Cold Shrink Straight Joint Splice (25kV)

3M Cold Shrink Terminations Connecting Nexans 12kV (MV) Cable Onto Copper Busbar

132kV Termination Using Pfisterer IXOSIL EST SUB Self Supporting Cable Termination

Jointers blog

Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

15,000+ Subscribers. ➡ Joints Terminations Cleats Lugs MV HV 11kV 33kV

 

25kV Elastimold Tee Connector Terminations Connected To S&C Vista Switchgear

May 6th, 2021

Image Courtesy of: Andy O’Malley (IBEW 258 EHV Cable Jointer/Splicer).

Location: Vancouver, Canada.

Jointer: Andy O’MalleyElastimold

We have the greatest pleasure in showcasing this first example of Andy’s jointing expertise on our Photoblog – terminating medium voltage cable into S&C switchgear using Elastimold Connectors.

We have plenty more Jointers Blogs from Andy, including an image series featuring the pulling, laying and terminating of 138kV Southwire EHV cable using NKT cable terminations.

Jointing is in the O’Malley genes. Andy’s father Patrick inspired him to follow in his footsteps – we hope to soon run some “old-skool” photo’s from the family archive of Patrick’s splicing work.

Whether down the trench or up the pole, Andy is a key member of the Allteck team.Allteck

Allteck are international leaders in the design, construction, maintenance and upgrade of overhead and underground high voltage electric power utilities.25kV Elastimold Tee Connector Terminations Connected To S&C Vista Switchgear

S&C Electric Company – Vista® SD Underground Distribution Switchgear

S&C Electric Company

S&C Electric Company offers another choice in metal-enclosed gear.

Economical new Vista SD Underground Distribution Switchgear is the first practical solid-dielectric medium voltage switchgear with a visible open gap and field-replaceable bushings.

The elbow-connected MV switches and fault interrupters are encapsulated in an environmentally friendly solid-dielectric insulating material.

S&C Electric Company Blog – GridTalk

 

Jointers blog

Subscribe now to our POWER NEWSLETTER– a monthly email circulation packed with news, projects, videos, technical tips, training information, promotions, webinars, career opportunities and white papers.

Includes access to our popular JOINTERS BLOG with contributions from utility professionals, linesmen and cable jointers working on MV HV EHV cables and overhead lines typically at 11kV, 33kV, 66kV and up to 132kV.

15,000+ Subscribers. ➡ Joints Terminations Cleats Lugs MV HV 11kV 33kV

 

 

Associated manufacturers
Share this page
Share this page
X

Get a quote

Complete the form below to make an enquiry about products.

  • This field is for validation purposes and should be left unchanged.
  • Please enter your full name.
  • Please enter your contact telephone number.
  • Please enter your e-mail address.
  • Please select if you are enquiring about products for the UK or for export.