Cable Joints & Terminations HV
Nexans Offshore & Onshore Export Cables | Seagreen The Largest Windfarm Project In Scotland
January 31st, 2022
Nexans Power Export Cable Supplier For The Seagreen Offshore Wind Farm Project
Offshore & Onshore Power Export Cables
Seagreen Offshore Wind Farm Project
Location: Scotland
Partnership: SSE Renewables
Market: Wind Farms-Offshore
Nexans is SSE’s preferred supplier for the design, manufacture and installation of the onshore and offshore export cables for the 1,075MW Seagreen wind farm project. Nexans will supply and install three 65 km offshore export cables and three 20 km onshore export cables.

About the project
Phase 1 development, comprising the Seagreen Alpha and Bravo wind farms. It will have combined capacity of 1,075MW. When complete it will form the largest windfarm project in Scotland when they come online in 2024. To promote contract opportunities for local companies, SSE Renewables organises ‘Meet the Buyer’ events, where they can discuss their service offerings with members of the supply chain.
Seagreen Project Director John Hill said: “We are pleased to announce Nexans as our preferred supplier to design, supply and install the onshore and offshore export cable. Nexans is one world leaders in this field and this agreement is a major step forward for the Seagreen project.”

Seagreen Offshore Wind Farm project
The Seagreen Offshore Wind Farm project is located 27km off the coast of Angus in the North Sea.
A joint venture between TotalEnergies (51%) and SSE Renewables (49%), Seagreen will be Scotland’s largest and the world’s deepest offshore wind farm when complete.
The Seagreen offshore wind farm was consented with permission granted to install 150 offshore wind turbines.
114 offshore wind turbines are currently under construction with an installed capacity of 1,075MW and will be fully operational by early 2023. The power generated will be exported to the grid via a new substation at Tealing near Dundee.
The 114 Seagreen wind turbines will provide enough green energy to power more than 1.6 million homes, equivalent to two-thirds of all Scottish homes. They will also displace over 2 million tonnes of carbon dioxide from electricity generated by fossil fuels every year – similar to removing more than a third of all of Scotland’s annual car emissions and making a significant contribution to Scotland’s net-zero ambition by 2045*.
The remaining 36 offshore wind turbines are consented but not yet constructed. The power will be exported to the grid via Cockenzie, East Lothian.
In January 2022 Seagreen submitted a Screening Report to Marine Scotland to increase the size of the 36 consented turbines.

FURTHER READING
- Onshore Wind Farms: Nexans Awarded Underground Power Cable Contract for Viking Wind Farm
- Nexans Windlink® Cables To Electrify The Future Of Onshore Wind Turbines
- Nexans OJC Offshore Medium Voltage Junction Cabinets For Wind Power Projects
- Nexans Power Cable Accessories For Wind Energy Projects – MV & HV Cables




See how T&D support, supply and service the Renewable Energy industry.
Specialist Distributors to the UK and international Offshore Wind & Renewable industry to provide safe and reliable LV HV Electrical Cable & Power Distribution Systems up to 66kV – we are highly customer responsive and absolutely committed to providing a world-class service. Contact our UK Power Team for competitive quotations, fast delivery from stock and technical support or training on all LV-HV products.
Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV
Substation Earthing for Low, Medium & High Voltage Systems | CPD Training By EA Technology
January 25th, 2022
Substation Earthing for Low, Medium & High Voltage Systems
Substation Earthing
EA Technology – CPD Training
Cost: £1220
Course Duration: 3 Days
Course Location: Capenhurst, Chester
Dates: 17th-19th May 2022
CPD Information: 18 Hours
Sign Up Here: https://eatechnology.com/training/scheduled-courses/substation-courses/substation-earthing/
Day one
Introduction and Principles of Earthing in LV, MV and HV Systems
- Role, principles and importance of earthing
- Preventing electric shock in LV systems
- Earth faults, fault voltages, EPR and voltage gradient in MV and HV systems
- Impedance in earthing and bonding conductors
- Important criteria for earthing assessment
LV Earth Systems and Earth Terminals
- Earthing requirements for public LV systems
- Earth terminals for supply points in public and private LV cable systems
- Abnormal voltages on LV earth terminals
- Requirement to separate HV and LV earth systems
- Special LV earthing situations
Earth Fault Current and EPR Analysis
- System earthing
- Redial and non-radial systems
- Simplified and rigorous fault current analysis
- Data and accuracy for project and EPR assessments
Introduction to Earth Standards and Company Earthing Policies
- The need for standards and company procedures
- The voltages and environmental impact that occur during earth fault at a substation
- Description of safety voltages, limit values and ways they are constrained
- Developments in ENA S34 and 14-24
Introduction to Earthing Design
- Earthing standards; how this guides design practice
- Main design criteria
- Introduction to earth resistance formulae
- Comparison of ways to reduce the earth resistance
Day two
Design of Substation Earthing
- Stages in the design of a LV distribution substation
- Use of standard formulae to investigate design options and check compliance
- Design of the local substation electrode system
- Design of the earthing system for a HV substation
- Exercise in developing the outline electrode design
Measurement Theory
- Earth resistivity
- Earth resistance
Practical Measurement Exercise
- Group exercise undertaking soil resistivity and electrode resistance measurements
Analysis of Measurement Data
- Delegates will use specialist software to gain a derived soil model for design purposes
- Analysis of electrode resistance data to calculate the true resistance of the measured earthing system
Day three
Industrial Site Measurement Case Study
- Undertaking measurements in difficult locations
- Highlight the important issues
- Explanation of procedures
Analysis of Earth Fault Current and EPR in more Complex Network Arrangements
- Network calculation procedures
- Mixed underground and overhead systems and isolated cable sections in overhead lines
- Identifying points of worst case EPR
Example Case Studies and Calculations of EPR and risk effects in Industrial, generation and public HV and MV Systems
- Generation and industrial sites connected to cable and overhead line systems
- Separation of HV/MV and LV earth systems in high resistivity areas
- LV installations in vicinity of HV equipment with high EPR
Course Review
Programme may be subject to amendment.
Why Should I Attend?
- Enhance your knowledge of earthing principles and systems
- Understand the legal and environmental framework and standards that apply to earthing systems
- Develop your ability to specify earthing system design to current standards
- Reduce the risk of critical system failure through enhanced design
- Enhance your understanding of the role of earthing systems in safe working practices
- Enhance your understanding of earthing measurement processes and the analysis of measurement data
- Develop knowledge of managing earthing system design and maintenance projects
This course is delivered by leading specialists in earthing assessment, design and audit and draws on their extensive expertise in the field.
Click Here To Sign Up Today
Testimonials
‟Fascinating course due to the extensive knowledge of the presenter. Lots of myths debunked!! Enough knowledge attained to be able to challenge consultant designers and know the right questions to ask. Undoubtedly a good investment in time.”
Ade
15-17 June 2021
‟Definitely improved my technical knowledge of more up to date modern thinking & the standards used within the UK. Very informative, even though the formulas slightly taxing as I am 35 years since being in any educational, academic faculty. Presenters were very good & very approachable. Thanks.”
Paul
15-17 June 2021
‟Extremely informative, well presented and well organised. Thank you. ”
Tom
15-17 June 2021
‟Extremely informative.”
Jim
15-17 June 2021
‟Good course, expanded my knowledge considerably.”
Michael
15-17 June 2021
EA Technology

EA Technology are a global provider of end to end power engineering solutions and provide expert consultancy, innovative instruments, skills training, technical services and more.

William G. Higinbotham has been president of EA Technology LLC since 2013. His responsibilities involve general management of the company, including EA Technology activities in North and South America. William is also responsible for sales, service, support, and training on partial discharge instruments and condition-based asset management. He is the author or co-author of several industry papers.

Supplying Cable Termination, Jointing, Pull-in & Electrical Equipment up to 66kV
Thorne & Derrick distribute the most extensive range of MV HV Medium & High Voltage Cable Joints, Terminations & Connectors from manufacturers including 3M, Prysmian, Nexans Euromold, Elastimold, Pfisterer CONNEX and Shrink Polymer Systems.
Heat shrink, cold shrink, push-on and slip-over cable accessories enable the jointing, terminating and connection of 11kV-33kV and 66kV-132kV cables to oil, air or gas insulated switchgear, transformers, motors and overhead lines distributing electricity at MV HV.

MV HV High Voltage Cable Joints | Cable Terminations | Cable Connectors | Distributed from Stock | UK & Export Sales
ABB & UK Power Networks Switch To A Sustainable Future With The World’s First 36kV Double Busbar AirPlus™ Switchgear
January 17th, 2022

-
Special thanks to Sarah Perrins Managing Director at Limegreen Communications
for permission to republish
ABB and UK Power Networks
- UK Power Networks announces plans to reduce its use of Sulfur Hexafluoride (SF6), the world’s most potent greenhouse gas
- As part of its Environmental Action Plan, the UK’s biggest electricity distributor will install ABB switchgear containing innovative AirPlus™ insulating gas, which has almost zero global warming impact
- ABB’s AirPlus innovative double busbar design reduces the risk of unplanned downtime and provides greater flexibility of power load sharing
UK Power Networks, which provides power to 8.3 million homes and businesses, has commissioned ABB to supply the world’s first 36 kV medium-voltage double busbar AirPlus Gas Insulated Switchgear (GIS). It features AirPlus gas, which acts as an insulator between the electrical contacts with almost zero global warming impact.
As part of its Environmental Action Plan to pass on a sustainable planet for future generations, the UK’s biggest electricity distributor, UK Power Networks has announced plans to use AirPlus, ABB’s innovative sustainable alternative to SF6 switchgear, at its substation in Kent.
➡ Thorne & Derrick provide the full ABB range of Medium Voltage Products for the utility, industrial and commercial customers with safe, reliable and smart technologies for the distribution of electricity, typically at LV and MV voltages (11kV 33kV). The extensive ABB products offering includes distribution automation products, circuit protection, joints and terminations, switching, limiting, surge arresters, measuring and sensing devices, switchgear, modular substation packages and related services for MV electrical power systems.

Transitioning to AirPlus will help UK Power Networks to achieve sustainability targets
As Europe moves towards tighter regulation on the traditional gas (SF6,) used in switchgear, ABB’s AirPlus provides a compelling eco alternative. Unlike SF6, which is a potent greenhouse gas with a global warming potential 23,500 times greater than that of carbon dioxide (CO2)), ABB’s AirPlus gas has almost zero global warming impact. It is designed to drive high reliability and fulfill upcoming environmental regulations for segments like utilities.
Commenting on the installation, Alessandro Palin, President of ABB’s Distribution Solutions division explained: “As part of our 2030 Sustainability Strategy, ABB is committed to helping customers and suppliers reduce their emissions. AirPlus is a key part of this strategy, and we are proud to work together with utilities such as UK Power Networks to make the switch to eco alternatives, that not only provide reliable power but will also protect our planet. A pioneer in this field, ABB has installed thousands of SF6-free solutions globally. Moving from SF6 to an SF6-free portfolio is an important milestone towards enabling a low carbon society.”

As part of its Environmental Action Plan, the UK’s biggest electricity distributor will install ABB switchgear containing innovative AirPlus
Transitioning to AirPlus will help UK Power Networks to achieve its sustainability targets, as it offers the same footprint and similar performance as an SF6 switchgear and operates at lower-tank pressures. The higher the voltages, the higher the pressure in the switchgear, but thanks to AirPlus, ABB’s switchgear can handle the pressure, having a safe low-pressure design with similar dielectric insulation benefits and footprint as an SF6 switchgear. The revolutionary double busbar design gives the additional benefit of reliability by reducing the risk of unplanned downtime and offering more flexibility in sharing the power load.
In addition to enhancing the collaboration with UK Power Networks, this contract confirms the acceptance of AirPlus technology as a reliable alternative to SF6 for utilities in the UK. A complete switchgear solution will be delivered to the company’s substation in Dartford, Kent, before the end of 2021.
Barry Hatton, director of asset management at UK Power Networks, said: “We have clear goals to reduce the environmental impact of our operations and help enable the country’s transition to net zero carbon emissions, while maintaining reliable electricity supplies for more than eight million homes and businesses. Our new AirPlus switchgear supports our strategy and delivery of our Environmental Action Plan.”
ABB was one of the first companies to offer SF6-free switchgear solutions for MV ranges up to 40.5 kV, with the largest global installed base of over 5,000 ecoGIS switchgear installations since 2015.

In addition to enhancing the collaboration with UK Power Networks, this contract confirms the acceptance of AirPlus technology as a reliable alternative to SF6 for utilities in the UK
ABB (ABBN: SIX Swiss Ex) is a leading global technology company that energizes the transformation of society and industry to achieve a more productive, sustainable future. By connecting software to its electrification, robotics, automation and motion portfolio, ABB pushes the boundaries of technology to drive performance to new levels. With a history of excellence stretching back more than 130 years, ABB’s success is driven by about 105,000 talented employees in over 100 countries. www.abb.com
ABB’s Electrification Business Area is a global leader in electrical products and solutions, operating in more than 100 countries, with over 200 manufacturing sites. Our 50,000+ employees are dedicated to transforming how people live, connect and work by delivering safe, smart and sustainable electrification solutions.
We are shaping the future trends of electrification, differentiating through technological and digital innovation while delivering an outstanding experience through operational excellence for our customers across utilities, industry, buildings, infrastructure and mobility. For more information visit https://go.abb/electrification
UK Power Networks is the UK’s biggest electricity distributor, making sure the lights stay on for more than eight million homes and businesses across London, the South East and the East of England. Network operators aren’t the same as energy suppliers; network operators manage local power lines and substations, while energy suppliers sell the electricity that runs through the power lines.
UK Power Networks continues to be listed in the Top 25 Best Big Companies to Work For and made industry history by becoming first company to win Utility of the Year two years running (2015 and 2016 also 2012). The company invests more than £600 million in its electricity networks every year, offers extra help to vulnerable customers at times of need, and is undertaking trials to ensure that electricity networks support the transition to a low carbon future. It also moves cables and connects new electricity supplies. If you have a power cut ring 105, see www.ukpowernetworks.co.uk or tweet us @UKPowerNetworks
About LimeGreen

Limegreen Communications is a powerful collective of experienced, senior communications professionals with a passion for delivering engaging earned content and award-winning campaigns.
Founders Sarah Perrins and Jo Mathers worked with leading FTSE 250 companies and PR consultancies before deciding to share their knowledge and expertise more widely and to create Limegreen Communications.
Today, Limegreen is a collective of like-minded associates, who share that special mix of agency and in-house experience and understand what it’s like to be the client. We know how to generate results – whether written or visually – that will ensure cut-through in our content heavy world.

LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
Key Product Categories: Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV
3M QT-III | Cold Shrink Terminations | Video Demonstration
January 17th, 2022High Voltage Cable Terminations
- Tight Cable Sealing – HV termination retains resiliency and pressure after prolonged aging and outdoor pollution exposure
- Flexible Cold Shrink – QT-III accommodates all power cable manufacturers bend radius tolerances and recommendations
- Reliability – high dry and wet insulation resistance for switchgear, transformer or outdoor pole termination
- Versatile – QT-III Cold Shrink terminations install quickly and accommodates a wide range of cable sizes
- Dependable – proven long-term reliability and safe operation at overload temperature on MV HV power system networks
- Time Efficient – reduced installation time for the Jointer compared to heat shrink, electrical taping or resins
- Ozone, Heat and UV Resistance – the physical characteristics of silicone rubber Cold Shrink provide excellent performance over the very wide temperature range of -150°F (-100°C) to 600°F (315°C)
Cold Shrink Reliability Record Low Failure Rates*: – 0.067% for Cold Shrink Cable Joints/Splices – 0.022% for Cold Shrink Terminations
*Data based upon U.S. failure data of U.S. manufactured 3M Cold Shrink Medium & High Voltage Cable Accessories between 2009 and 2012.
QT-III
Stocked & Supplied by Thorne & Derrick | Technical Support | Competitive Prices | UK & International Projects
From the Field – Pictured: Cold Shrink Terminations manufactured by 3M Electrical shown terminating 11kV polymeric single core power cables to be used as transformer link cables.

More from 3M Electrical

- Continuous Shearhead Bolt vs. Crimp Compression Technologies By 3M Electrical
- 3M Electrical Tapes Guide | The Tape For Every Task
- 3M Terminations | Surface Tracking on Medium Voltage Cable Terminations by 3M Electrical
- 66kV Terminations | NEW Stock Introduction for 3M Cold Shrink Cable Terminations
- Stress Control | MV Cable Terminations by 3M Electrical
- Q/ Can 3M Electrical Offer MV Cable Joints For Hazardous Areas?
- MV Cable Jointing & Some Jointers Tips Using 3M Scotch Tapes

Supplying Cable Termination, Jointing, Pull-in & Electrical Equipment up to 66kV
Thorne & Derrick distribute the most extensive range of MV HV Medium & High Voltage Cable Joints, Terminations & Connectors from manufacturers including 3M, Prysmian, Nexans Euromold, Elastimold, Pfisterer CONNEX and Shrink Polymer Systems.
Heat shrink, cold shrink, push-on and slip-over cable accessories enable the jointing, terminating and connection of 11kV-33kV and 66kV-132kV cables to oil, air or gas insulated switchgear, transformers, motors and overhead lines distributing electricity at MV HV.

MV HV High Voltage Cable Joints | Cable Terminations | Cable Connectors | Distributed from Stock | UK & Export Sales
HV Cable Joints, Terminations & Connectors I Blog Library
January 11th, 2022
Main UK Stockists & Distributors of 3M, Nexans & Pfisterer
Resource Centre | Education & Learning
Thorne & Derrick provide competitive prices and fast delivery from extensive UK stocks of a complete range of of LV, MV, HV Cable Joints, Terminations & Connectors to connect, splice, repair and maintain medium/high voltage cable and power distribution systems.
A complete range of Joints, Terminations & Connectors utilising EPDM rubber, heat-shrink and cold applied technologies are available for medium and high voltage power cable networks up to 66kV from 3M, Nexans & Pfisterer.
TOP BLOG PICKS
See our collection of the Top Blogs featuring the complete range of Medium Voltage Power Cable Accessories & Cable Services that Thorne & Derrick can offer:
- 3M Cold Shrink Vs Heat Shrink
- How To Apply 3M Cold Shrink Cable End Caps
- 3M QT-III | Cold Shrink Terminations | Video Demonstration
- Jointer Training Courses 11kV 33kV 66kV
- Nexans Euromold Connectors – Webisodes
- Water Sealing, IP Rating & Temperature Range Of Nexans Euromold Connectors
- Different Insulating Epoxy Plugs & How To Install The Cap On Nexans Euromold Interface C Compact Connectors
- Bevelling The Edge Of The Core Insulation During Installation Of Nexans Euromold Connectors
- Installation & Clamping Of Nexans Euromold Compact Connectors Onto Their Mating Bushings
- Innovation : Heat-Shrinkable Joint with Triple Layer Tube By Nexans
- MV Cable Joints | Nexans NEW PRODUCT Launch
- 66kV Cable Jointer Training – A Question Of Competency Not Familiarisation
- Nexans Euromold Connectors – Webisodes
- Essential Reading – Medium Voltage Cable Accessories Book Published By Nexans
- Sicon | Did You Know That PFISTERER Invented Hexagonal Pressing In The 1950s?
- SICON By PFISTERER | Shearbolt Connectors with Stepless Shear-Off Bolts
- PFISTERER Connex | Separable Connectors MV Specification Guide
- Pfisterer Connex Cable Plugs – Cable Terminations For MV-HV 33kV Cables
- Cable Damage | PFISTERER Universal Repair Kit
- 100 Years of PFISTERER – Connecting Power For The Future
Sector Focus
- Joints & Terminations for Network Rail 25kV Electrification Projects | PADS Approved
- Connecting High Voltages & Energising Data Centres
Featured Jointers
- Richie Rice | LS 220kV Cross Bonded Joint XLPE 2500sqmm Copper
- Richard Mason | 400kV ODSE Terminations | Moray East by GCS & Sudkabel
- Johnothan Bocor | Nexans Slip-on Terminations 33kV | Wind Farm MV Cables
- Andy O’Malley | Terminating 300kV Nexans Transformer Cable Using Pfisterer 6S (245kV)
- Andrew Brezovszky | Masterclass : Pirelli 33kV Fluid Filled Oil Cable Jointing
- Lee Bavington | Angle-DC Project | Cold Shrink Terminations 33kV Cable In DC Inverter
- John Harrison | Array Cables | High Voltage Cable Termination & Testing for Wind Farms
- Michael White | 220kV 2000sqmm Copper Enamelled Cable | Sandblasting by Jointers
Tooling Feature
- Alroc CWB-18-60-MVS – MV Bonded Semicon Removal & Stripping Tool | Video
- Semicon Screen – The Most Critical Point In Any MV Joint, Termination Or Connector
Technology Features
- Cable Testing – Is Resonance Testing The Way Forward For Offshore Wind?
- Severe Defects Missed By Tangent Delta Testing – read how IMCORP”s Factory Grade® Technology can help cable owners pinpoint these problems
- MV Heat Shrink Cable Terminations Can Fail Despite Passing VLF Tests
- Cold Shrink Splices & Cable Jointer Training

➡ For Cable Jointing Tools & Accessories I Alroc I Cembre I Klauke